Basis
GB 18918-2002 Table 1 gives the discharge limits as daily-average values in mg/L; the 2025 amendment, effective 2026-03-01, leaves those daily averages unchanged and adds the instantaneous maxima in Table 4. The process combinations are common engineering practice and are not mandatory under the standard. The Middle East extended-aeration range is from the Saudi MEWA guide. EN 12566-3 is a product standard for packaged and site-assembled domestic wastewater treatment plants up to 50 PT, not a pan-European emission permit.
National limits, GB 18918-2002 Table 1 (daily average, mg/L)
Grade 1A is the strictest of the three grades shown and Grade 2 is the least strict. Grade 3 is outside this table because it is a township-specific case, not a general municipal grade; its scope is explained below.
| Parameter | Grade 1A | Grade 1B | Grade 2 |
|---|---|---|---|
| COD | 50 | 60 | 100 |
| BOD₅ | 10 | 20 | 30 |
| SS | 10 | 20 | 30 |
| NH₃-N | 5 (8) | 8 (15) | 25 (30) |
| TN | 15 | 20 | — |
| TP | 0.5 | 1 | 3 |
Daily averages in mg/L. For ammonia-N, the value outside the brackets applies when the water temperature is above 12 °C and the value inside the brackets applies at or below 12 °C. A dash means the grade sets no limit for that parameter: it is not zero and not a pass. The total-phosphorus row shown applies to plants built from 2006-01-01; plants built on or before 2005-12-31 use 1 / 1.5 / 3 mg/L and move to this row from 2028-01-01. Grade 3 is outside this table; its township scope is explained in the evidence note below.
Target to typical process train
| Target | Typical process train | Notes |
|---|---|---|
| Grade 2 / Grade 1B | A/O or A²/O + secondary clarifier + disinfection | Where only organics are controlled it can fall back to biological contact oxidation |
| Grade 1A | A²/O or MBBR + secondary clarifier + advanced treatment (coagulation sedimentation + deep-bed filter + disinfection); or MBR directly | MBR omits the secondary clarifier and takes less space; energy use and membrane replacement are the trade-offs |
| Reuse | MBR + disinfection; MBR + RO where a high degree of desalination is required | Water quality is set by GB/T 18920-2020; GB 50335-2016 is the design code, not a limit table |
| Export, UK and EU | EN 12566-3 type test plus a local discharge permit | In the UK the discharge is also subject to the permit and to drainage-field conditions |
Process combinations are common engineering practice, not a mandatory requirement of the standard. A standard limit is not an equipment guarantee: the guaranteed effluent is fixed by the contract, the influent and the acceptance method.
How to choose the applicable row, and where it stops
The table gives the limits. This section explains how to choose the row that applies, why the temperature and construction-date conditions exist, what a dash means, how the 2025 amendment changes the time basis, and which process trains are engineering choices rather than standard requirements. Value sources and explanation sources are kept separate.
The table time basis
Daily average, mg/LNational standard table
- What it is for
- The six rows are the daily-average limits of GB 18918-2002 Table 1, the basis on which a process train is compared with a discharge target.
- Why the value is stated this way
- Table 1 is headed maximum permitted discharge concentration (daily average). The 2025 amendment leaves these daily averages unchanged and adds a separate Table 4 for instantaneous values.
- How to choose
- Use this table to choose the grade and the daily-average target; check the permit for any instantaneous limit as well.
- When not to use it
- This is not the complete compliance basis: from 2026-03-01 the instantaneous values in Table 4 also apply.
Explanation basis: Definition of the table basis
Choosing the applicable row
Grade, then ammonia temperature band, then total-phosphorus construction yearNational standard table and notes
- What it is for
- Four choices decide which cell applies: the discharge grade, the water-temperature band for ammonia, the construction date for total phosphorus, and whether the cell is a dash.
- Why the value is stated this way
- GB 18918-2002 Table 1 grades are 1A, 1B and 2 for this page; note 2 sets the ammonia bracket at 12 °C; note 3 sets the total-phosphorus construction-date rows.
- How to choose
- Read the grade first, then the ammonia bracket for the design water temperature, then the total-phosphorus row for the construction date. Where the cell is a dash, the parameter is not limited at that grade.
- When not to use it
- Do not read a row across grades, do not drop the temperature or construction-date condition, and do not treat Grade 3 as another general municipal grade.
Ammonia-N at 12 °C
Outside the brackets above 12 °C; inside at or below 12 °CNational standard table note
- What it is for
- The two ammonia numbers in each grade cell are one limit under two water-temperature conditions, not two alternative limits.
- Why the value is stated this way
- Table 1 note 2: the value outside the brackets applies when the water temperature is above 12 °C; the value inside applies at or below 12 °C. Table 4 uses the same rule.
- How to choose
- Fix the design water temperature first, then read the corresponding ammonia number for the grade. For a winter design, use the bracketed value.
- When not to use it
- Do not compare a design against the outside-bracket value without stating the temperature basis, and do not mix the daily-average and instantaneous ammonia values.
Value source:GB 18918-2002, Discharge standard of pollutants for municipal wastewater treatment plant (consolidated text including the 2006 and 2025 amendments)Amendment to GB 18918-2002, attachment to Announcement No. 24 of 2025
Explanation source:GB 18918-2002, Discharge standard of pollutants for municipal wastewater treatment plant (consolidated text including the 2006 and 2025 amendments)
Total phosphorus and construction date
0.5 / 1 / 3 mg/L for plants built from 2006-01-01National standard table note
- What it is for
- The total-phosphorus row is selected by the construction date of the plant, not by the grade alone.
- Why the value is stated this way
- Table 1 note 3 and the two total-phosphorus rows: plants built from 2006-01-01 use 0.5 / 1 / 3 mg/L; plants built on or before 2005-12-31 use 1 / 1.5 / 3 mg/L and move to the new row from 2028-01-01.
- How to choose
- State the construction date, then read the matching row. For an existing plant built before 2006, use the older row until 2028-01-01.
- When not to use it
- Do not apply 0.5 / 1 / 3 to a pre-2006 plant before 2028-01-01, and do not omit the construction-date condition from a quotation.
The pre-2006 total-phosphorus row
1 / 1.5 / 3 mg/L, until 2028-01-01National standard table
- What it is for
- The older row remains the applicable limit for plants built on or before 2005-12-31 until the transition date.
- Why the value is stated this way
- Table 1 lists 1 / 1.5 / 3 mg/L for plants built before 2006-01-01; note 3 sets 2028-01-01 as the date from which they follow the 2006 row.
- How to choose
- Use 1 / 1.5 / 3 mg/L for a pre-2006 plant before 2028-01-01; from 2028-01-01 use 0.5 / 1 / 3 mg/L.
- When not to use it
- The transition does not make the old row a design target for a new plant, and it does not apply before 2028-01-01.
A dash is not zero
No limit at that gradeNational standard table
- What it is for
- A dash means the grade does not constrain the parameter; it is not a limit of zero and it is not a statement that the plant passes.
- Why the value is stated this way
- Table 1 prints a dash for total nitrogen at Grade 2 and for ammonia and total nitrogen at Grade 3. The dash is the absence of a limit, not a numeric value.
- How to choose
- Report the parameter as not limited at that grade, and check whether the permit or another standard sets a limit.
- When not to use it
- Do not convert a dash to 0, do not treat it as a pass, and do not use it to claim removal performance.
Explanation basis: Definition of the table notation
Grade 3: the township boundary
Non-key basin, non-source-protection townships; enhanced primary with secondary capacity reservedNational standard clause
- What it is for
- Grade 3 is a specific township case, not a fourth general municipal grade.
- Why the value is stated this way
- GB 18918-2002 §4.1.2.4: township wastewater treatment plants outside key control basins and source-protection areas may apply Grade 3 where the local economic conditions and water-pollution control requirements call for it, when they use enhanced primary treatment, provided they reserve the position for secondary treatment and reach Grade 2 in stages.
- How to choose
- Check the township status, the basin and source-protection classification, whether the local economic conditions and water-pollution control requirements call for Grade 3, and whether the plant uses enhanced primary treatment with reserved secondary capacity before applying Grade 3.
- When not to use it
- Not for a general municipal plant, not for a plant in a key control basin or source-protection area, and not a substitute for the Grade 1A, 1B and 2 comparison.
Townships below 500 m³/d
Below 500 m³/d, excluding county-seat townships: provincial local standardNational standard clause
- What it is for
- The amendment sends small township plants to the provincial local standard instead of applying the national table directly.
- Why the value is stated this way
- §4.1.2.5, added by the 2025 amendment item 3: township plants below 500 m³/d, excluding those that are the seat of a county government, apply the local water-pollutant discharge standard set by the province, autonomous region or municipality; where no local standard exists, this standard may be referenced.
- How to choose
- Identify the township, confirm that it is not a county seat and that the flow is below 500 m³/d, then obtain the provincial local standard.
- When not to use it
- The 500 m³/d threshold does not apply to county-seat townships, and the national standard is only a reference where no local standard exists.
Value source:GB 18918-2002, Discharge standard of pollutants for municipal wastewater treatment plant (consolidated text including the 2006 and 2025 amendments)Amendment to GB 18918-2002, attachment to Announcement No. 24 of 2025
Explanation source:Amendment to GB 18918-2002, attachment to Announcement No. 24 of 2025
When the 2025 amendment applies
Effective 2026-03-01Official announcement
- What it is for
- The amendment is part of the standard from 2026-03-01; before that date the daily-average table is the operative text.
- Why the value is stated this way
- MEE Announcement No. 24 of 2025 issued the amendment on 2025-11-04 (printed 2025-11-06) and states that it takes effect on 2026-03-01.
- How to choose
- State the date for which the compliance assessment is made. A design or permit review after 2026-03-01 must include the Table 4 instantaneous values.
- When not to use it
- Do not describe the amendment as a 2026 publication: it was issued in 2025 and takes effect on 2026-03-01.
Value source:MEE Announcement No. 24 of 2025: amendment to GB 18918-2002
Explanation source:MEE Announcement No. 24 of 2025: amendment to GB 18918-2002
Daily averages and instantaneous values
Table 4: COD, ammonia-N, TN and TP instantaneous maximaOfficial amendment
- What it is for
- The 2025 amendment adds instantaneous maxima for four parameters while leaving the Table 1 daily averages unchanged.
- Why the value is stated this way
- Amendment item 6 adds Table 4, maximum permitted discharge concentration (instantaneous value), with COD, total nitrogen, ammonia-N and total phosphorus among its rows. Item 12 adds clause 6.3: the discharge concentration must not exceed the daily averages in Tables 1 to 3 or the instantaneous values in Table 4.
- How to choose
- Check both bases: the daily average against Table 1 and the instantaneous value against Table 4. A permit may state the sampling method and averaging period.
- When not to use it
- This table is the daily-average table only. It is not the complete compliance basis after 2026-03-01, and an instantaneous exceedance is a non-compliance even where the daily average is met.
Value source:MEE Announcement No. 24 of 2025: amendment to GB 18918-2002Amendment to GB 18918-2002, attachment to Announcement No. 24 of 2025GB 18918-2002, Discharge standard of pollutants for municipal wastewater treatment plant (consolidated text including the 2006 and 2025 amendments)
Explanation source:Amendment to GB 18918-2002, attachment to Announcement No. 24 of 2025
pH, colour and faecal coliform
Instantaneous values in Table 4Official amendment
- What it is for
- These three parameters moved out of the daily-average table and into the instantaneous table.
- Why the value is stated this way
- Amendment item 5 deletes colour, pH and faecal coliform from Table 1; item 6 adds them to Table 4 as instantaneous values, with pH 6 to 9 and colour and faecal coliform set by grade.
- How to choose
- Read pH, colour and faecal coliform against Table 4, not against a daily-average row.
- When not to use it
- Do not quote a daily-average limit for these three parameters; they are instantaneous in the amended standard.
Grade 2 and Grade 1B train
A/O or A²/O + secondary clarifier + disinfectionStandard design clauses and engineering practice
- What it is for
- For the looser municipal grades, a two-stage or nutrient-removal activated-sludge train with secondary clarification and disinfection is the common configuration.
- Why the value is stated this way
- GB 50014-2021 §7.6.16 and §7.6.17 cover A/O and A²/O process design, and HJ 576-2010 gives AAO design detail. The chart combination is engineering practice, not a mandatory requirement.
- How to choose
- Choose the train from the nitrogen and phosphorus target; where only organics are controlled, biological contact oxidation is an alternative.
- When not to use it
- Not a standard-mandated line-up and not an equipment guarantee; the final train is fixed by the influent and the permit.
Biological contact oxidation
Where only organics are controlledStandard design clause
- What it is for
- Biological contact oxidation is an attached-growth process used where the discharge target controls organics without a nutrient-removal duty.
- Why the value is stated this way
- GB 50014-2021 §7.8.4 covers biological contact oxidation design.
- How to choose
- Use it only where the permit does not set a nitrogen or phosphorus limit that requires a nutrient-removal train.
- When not to use it
- Not a substitute for a nutrient-removal train where nitrogen or phosphorus is limited.
Grade 1A train
A²/O or MBBR + secondary clarifier + advanced treatment; or MBRStandard design clauses and engineering practice
- What it is for
- The strictest grade usually needs biological nutrient removal followed by advanced treatment, or a membrane bioreactor.
- Why the value is stated this way
- GB 50014-2021 §7.6.16, §7.6.42 for MBR, §7.8.28 for MBBR and §7.11.2 for advanced treatment support the combinations; HJ 2010-2011 covers membrane bioreactor design.
- How to choose
- Select the combination from the permit, the influent and the site; advanced treatment may include coagulation, sedimentation, filtration and disinfection.
- When not to use it
- The listed train is common practice, not a guarantee that every plant reaches Grade 1A; the contract and the acceptance method set the guarantee.
The MBR trade-off
No secondary clarifier; more energy and membrane replacementEngineering interpretation
- What it is for
- MBR replaces the secondary clarifier with a membrane separation step and takes less space.
- Why the value is stated this way
- HJ 2010-2011 describes the membrane bioreactor process; the trade-off between footprint and energy or membrane replacement is an engineering interpretation, not a measured comparison.
- How to choose
- Consider MBR where space is constrained or a high-quality effluent is needed; confirm flux, membrane area and operating cost per project.
- When not to use it
- No measured performance or cost comparison is claimed; membrane flux and area are not published on this page.
Value source:HJ 2010-2011, Technical specification for membrane bioreactor wastewater treatment engineering
Explanation basis: Engineering interpretation of membrane process trade-offs
Reuse standards
GB/T 18920-2020 water quality; GB 50335-2016 design codeNational standards
- What it is for
- Reuse is a separate water-quality target; the discharge table alone does not define it.
- Why the value is stated this way
- GB/T 18920-2020 sets water-quality limits for urban miscellaneous reuse; GB 50335-2016 is the design code for wastewater reclamation and reuse, not a limit table.
- How to choose
- Fix the reuse application first, then read the matching water-quality standard and design the train to it.
- When not to use it
- Do not present GB 50335-2016 as a limit table, and do not use the discharge limits as reuse limits.
Value source:GB/T 18920-2020, The reuse of urban recycling water — Water quality standard for urban miscellaneous useGB 50335-2016, Code for design of wastewater reclamation and reuse
Explanation source:GB/T 18920-2020, The reuse of urban recycling water — Water quality standard for urban miscellaneous useGB 50335-2016, Code for design of wastewater reclamation and reuse
EN 12566-3 scope
Product standard for packaged domestic plants up to 50 PTProduct standard
- What it is for
- The export route uses a product type test plus the local permit; EN 12566-3 is not an emission limit.
- Why the value is stated this way
- EN 12566-3:2016 covers packaged and site-assembled domestic wastewater treatment plants up to 50 PT and includes a type test and a ZA conformity annex.
- How to choose
- Use the type test as product evidence, then obtain the discharge permit for the site; in the UK the permit and drainage-field conditions also apply.
- When not to use it
- Not a pan-European emission permit, not a limit table and not a substitute for the local permit.
Value source:EN 12566-3:2016, Small wastewater treatment systems for up to 50 PT — Part 3: Packaged and/or site assembled domestic wastewater treatment plantsGOV.UK, General binding rules: small sewage discharge to the ground
Explanation source:EN 12566-3:2016, Small wastewater treatment systems for up to 50 PT — Part 3: Packaged and/or site assembled domestic wastewater treatment plants
Limits, process and guarantee
A standard limit is not an equipment guaranteeDefinition and contractual boundary
- What it is for
- The table states the regulatory limit and the usual process train; neither is a promise of the effluent a supplied plant will reach.
- Why the value is stated this way
- A discharge limit is set by the authority and applies to the treated effluent; an equipment guarantee is a contractual commitment for a defined influent and acceptance method. The two are separate documents.
- How to choose
- Use the table to choose the target and the train, then fix the guaranteed effluent, the influent envelope and the acceptance method in the contract.
- When not to use it
- Do not quote a table value as a guaranteed effluent, and do not treat a process combination as a performance warranty.
Value source:GB 18918-2002, Discharge standard of pollutants for municipal wastewater treatment plant (consolidated text including the 2006 and 2025 amendments)Definition of a standard limit, a process train and an equipment guarantee
Explanation basis: Definition and contractual boundary
Sources
GB 18918-2002, Discharge standard of pollutants for municipal wastewater treatment plant (consolidated text including the 2006 and 2025 amendments)
Table 1 (basic control items, daily average); Table 1 notes 2 and 3; §4.1.2.4; §4.1.2.5
Official MEE consolidated PDFMEE Announcement No. 24 of 2025: amendment to GB 18918-2002
Announcement text: issued 2025-11-04; printed 2025-11-06; effective 2026-03-01
Official announcementAmendment to GB 18918-2002, attachment to Announcement No. 24 of 2025
Items 3, 5, 6 and 12; Table 4 (instantaneous values); clause 6.3
Official amendment PDFGB 50014-2021, Outdoor Wastewater Engineering Design Standard
§7.6.16, §7.6.17, §7.6.42, §7.8.4, §7.8.28, §7.11.2 and §7.13
Official announcementGB 50014-2021 full-text mirror
§7.6.16, §7.6.17, §7.6.42, §7.8.4, §7.8.28, §7.11.2 and §7.13
Full-text mirror used for cross-checkHJ 576-2010, Technical specification for anaerobic-anoxic-oxic activated sludge wastewater treatment engineering
Tables 4 and 5; process design clauses
Official PDFHJ 2010-2011, Technical specification for membrane bioreactor wastewater treatment engineering
Scope and process section
Official pageGB/T 18920-2020, The reuse of urban recycling water — Water quality standard for urban miscellaneous use
Current standard; water-quality limits for urban miscellaneous use
National standards platform recordGB 50335-2016, Code for design of wastewater reclamation and reuse
Design code; not a limit table
Official announcement reprintEN 12566-3:2016, Small wastewater treatment systems for up to 50 PT — Part 3: Packaged and/or site assembled domestic wastewater treatment plants
Scope: packaged and site-assembled domestic wastewater treatment plants up to 50 PT; ZA conformity annex
CEN catalogue recordGOV.UK, General binding rules: small sewage discharge to the ground
Permit threshold and drainage-field conditions
GOV.UK guidanceDefinition of a standard limit, a process train and an equipment guarantee
Terminology used on this chart; no external numeric source.
The target-country limits: who sets them, and where the original is
The GB 18918-2002 table above governs a plant discharging in China. A plant exported elsewhere is governed by the limits of the country it discharges in, and those limits are set by that country's environmental authority rather than by the equipment supplier. The three markets this site works in most are a good illustration of the method, because each one puts the authority in a different place.
- The Philippines: Republic Act 9275 (RA 9275), the Philippine Clean Water Act, and DENR Administrative Order 2016-08 (DAO 2016-08) set the water-quality and general-effluent framework; the Laguna Lake Development Authority (LLDA) issues permits for discharges in the Laguna de Bay basin. The permit for the individual site is issued by the DENR or the LLDA, and its conditions, sampling points and averaging periods are what the design is checked against. Ask the authority for the Administrative Order and the permit in force; both are public documents.
- Indonesia: domestic-wastewater limits start from Minister of Environment and Forestry Regulation P.68/MENLHK/SETJEN/KUM.1/8/2016, and the permit is issued at ministerial, provincial or district level according to the authority that has jurisdiction over the site. Under Law No. 32/2009 Article 20, the permit is issued by the minister, governor or regent/mayor according to their authority. The regulation that applies to the site, and the permit issued under it, govern the design.
- Saudi Arabia: the National Center for Environmental Compliance (NCEC) is the current environmental regulator, and its rules and regulations library is the current source. Older documents and permits may cite the Presidency of Meteorology and Environment (PME) environmental protection standards; those are historical references, not the current regulator. Limits are stated for the discharge route — a receiving water body, a municipal sewer or land application — so the route has to be fixed before the limit is read. Reuse quality is a separate question from discharge quality.
- In all three, the document that governs the design is the permit for that site rather than the general standard. A permit may be stricter than the national figure where the receiving water is classified as sensitive or where the site discharges to a protected catchment, and it usually adds the sampling points, the parameters and the averaging period that a compliance test has to follow.
- The review method is the same everywhere: find out which authority issues the permit, obtain that authority's own published regulation rather than a summary table from a brochure, check what the receiving water is classified as, and confirm whether a second authority — a basin body, a province or a municipality — sets a tighter value. The design is then fixed against that document, and the general standard is only the fallback where the permit says nothing.
- We do not reproduce the limit tables of other countries here. Numbers change, and a table copied from a secondary source is the most common way a design is fixed against a limit that no longer applies. The current text of the regulation is the only reliable source, and it is normally downloadable from the authority itself.
A plant discharging in Mexico is checked against NOM-001-SEMARNAT-2021, which classifies the receiving water body and sets the parameters to look at; reuse in services to the public is a separate question under the NOM-003-SEMARNAT-1997 framework. Foreign limit tables are not reproduced on this page — the Mexico page sets out the framework and the data needed for a quotation.
How to use and notes
- The limits are national-standard table values on a daily-average basis. The process combinations are common engineering practice, not a mandatory requirement of the standard; a limit is not an equipment guarantee.
- Ammonia-N: read the bracket rule before comparing a design against a limit, because the applicable number depends on water temperature: outside the brackets above 12 °C, inside the brackets at or below 12 °C.
- Grade 3 is outside this table. For a township plant outside key control basins and source-protection areas, Grade 3 may apply where the local economic conditions and water-pollution control requirements call for it and the plant uses enhanced primary treatment while reserving the position for secondary treatment; townships below 500 m³/d that are not the seat of a county government follow the provincial local standard.
- Middle East: Saudi MEWA mainly promotes extended aeration, with aeration time 18–36 h, MLSS 3,000–6,000 mg/L and sludge age 10–30 d.
- For reuse, the discharge standard alone is not enough; GB/T 18920-2020 sets the water-quality limits of the reuse application, and GB 50335-2016 is the design code rather than a limit table.
- The grades covered by the product line and the process configuration for each are fixed per project from the permit, the influent analysis and the process design; the MBR and MBBR lines are configured on that basis.