Sizing & procurementHow to size a containerized sewage treatment plant
A step-by-step walk from population and per-capita allowance to average daily flow, peak flow, tank volume and finally the container footprint.
Sizing & procurementWhat actually fits in a shipping container
Why the 2.352 m nominal internal width decides the shipping route for an assembled treatment unit, and how to estimate the loading before asking for a freight rate.
Sizing & procurementHow to specify a packaged sewage treatment plant
The inputs a supplier has to hold fixed before a number is a price: design flow, peak factor, influent quality, discharge grade, tank volume, box dimensions and site conditions.
Sizing & procurementReading design influent quality: what the numbers decide
A survey mean and an 80th percentile answer different questions, and the per-capita load basis is a third; using the wrong one changes both the tank volume and the process.
Sizing & procurementPower and site conditions when a plant ships abroad
Frequency, voltage, phase, generator supply, climate and spares — the site data an export plant has to be matched to before the offer is fixed.
Sizing & procurementSkid-mounted vs containerized vs civil works
Three ways to buy a plant — on a skid, inside a container, or built on site — and the boundary conditions that decide which one the project should take.
Sizing & procurementEqualization tanks: sizing for peak flow and peak load
What a wastewater equalization tank buffers, why the volume comes from a flow record rather than a rule of thumb, and where peak load disagrees with peak flow.
Sizing & procurementSurface loading rate and hydraulic loading rate: sizing a settling tank
How the surface loading rate decides what a settling tank removes, why depth does not change it, and the one case where the hydraulic loading rate is a different number.
Sizing & procurementPer capita water consumption: why it cannot size an industrial plant
Per capita water consumption is a municipal allowance, not a plant figure. What the allowance assumes, why an industrial site has no population to count, and what to measure in its place.
Sizing & procurementSource water decides the water treatment process
The train is set by five parameters in the raw water rather than by the country it comes from, and each parameter adds one identifiable step.
Sizing & procurementDissolved air flotation working principle: two details that decide dry oil or watery sludge
Air is dissolved into a pressurised stream, released as micro-bubbles and floated up with the oil. The mechanism is the easy half — where the oil leaves the tank decides what it costs to get rid of.
Sizing & procurementHow to Size an Automatic Polymer Dosing System
Start from the equipment and the control functions, separate the dose basis for water treatment from sludge dewatering, and check PAM consumption, working-solution demand and preparation capacity with a worked example.
Sizing & procurementHow to vet a wastewater treatment equipment supplier: 12 questions that decide a project
Twelve questions to put to every candidate on a shortlist, the answer standard each one has to meet, and the one row where our own record is still open.
Sizing & procurementSewage treatment plant contractor or equipment supplier: who selects, who signs, who carries the risk
Three procurement routes compared — a Saudi platform company and its contractors, Indonesian local government implementation, and Philippine franchisees, LGUs and water districts — with the documents a tender expects and the line between design and supply.
Sizing & procurementWhat is a PTAR? It is the Spanish term for a wastewater treatment plant
PTAR is the Spanish acronym for a wastewater treatment plant. What the four letters cover, the five duties behind them, the four build formats, and what fixes the design.
Sizing & procurementCampus and dormitory water treatment in Thailand: from source to tap
A campus rarely has one water problem. Reading the source, the storage tank and the point of use in that order is what separates a filtration job from a disinfection job.