- Home
- Philippines
Containerized wastewater treatment for Philippine projects.
Pre-assembled plants for municipal, community, resort and industrial sites across the archipelago — shipped in standard ISO containers and commissioned on site.
Send the design flow, the influent analysis, the receiving water class and the tender reference where one exists.

Segments we serve
LGU and municipal
Town and city wastewater facilities serving a defined population: capacity set from population, per-capita allowance and peak flow factor, then converted into container units on a small pad.
Barangay and community
Decentralised treatment for subdivisions and clustered households: a packaged train sized on the served population and peak flow, independent of a central sewer.
Island resorts
Properties that need reliable treatment independent of a central sewer: a container plant delivered by sea, barge and road, with MBR where reuse is required and land is limited.
Hospitals and clinics
On-site treatment where effluent quality is critical and disinfection is part of the train: the plant is scoped around the ward load and the discharge or reuse route agreed with the site.
Food processing
High-strength organic wastewater from processing lines: screening, grease removal and equalization ahead of A/O, MBBR or MBR, with the biological stage sized on COD and BOD.
Construction camps
Temporary sites that need treatment now and relocation later: a container plant on a small pad, moved to the next site when the works finish.
Regulatory context
Discharges in the Philippines are governed by the Clean Water Act (Republic Act No. 9275) and the effluent standards issued by the Department of Environment and Natural Resources (DENR). The limits depend on the receiving water classification, the discharge volume and local rules. Where the treated water is intended for reuse — irrigation, landscaping or flushing — the reuse target changes the process chain and the disinfection step.
Requirements depend on the classification of the receiving water body and on the discharge volume. Please confirm the current issuance applicable to your project with your local DENR office or your consultant.
Working with LGU procurement
LGU projects typically run through the Bids and Awards Committee (BAC) and a public tender. For these projects we prepare the technical specifications and support the bid document package, so the plant can be compared on equal terms with other compliant offers. The specification states the design flow, the influent characteristics, the process train, the discharge or reuse target and the power supply, in the same terms for every bidder. We answer clarifications in writing, and the same documents carry through to the contract and the commissioning checks.
Matching the process chain to the application
The rows below cover the duties we size most often in the Philippines. The final train is fixed once the flow, the influent analysis and the DENR receiving water class are known.
Wide table: scroll sideways to see every column.
| Application | What sets the load | Pre-treatment | Core process | Reuse or sludge |
|---|---|---|---|---|
| LGU and municipal | Population, per-capita allowance and peak factor | Screening, grit removal, equalization | A/O or MBBR; MBR where the footprint is tight | Disinfection before discharge; sludge dewatering |
| Barangay and community | Served population and peak flow | Screening, grease removal, equalization | A/O or MBBR | Disinfection; sludge handling by the operator |
| Island resorts | Peak occupancy, limited land and sea access | Screening, grease removal, equalization | MBR for a compact footprint | Disinfection for irrigation or flushing; sludge dewatering |
| Food processing | High COD and BOD, fats, oils and grease | Screening, grease removal, DAF, equalization | A/O, MBBR or MBR sized on the organic load | Irrigation where permitted; sludge dewatering |
| Hospitals and clinics | Ward load and disinfection requirement | Screening, equalization | A/O or MBBR; MBR where reuse is required | Disinfection; sludge dewatering |
| Construction camps | Temporary population and relocation | Screening and equalization in the container | A/O or MBBR | Disinfection; sludge handling by the operator |
A container unit is the transport format; the number of units follows the flow and the peak factor.
Published equipment ranges
These are the published ranges of the equipment families we build. They are not a selection; the unit count and the process train are confirmed against the project data.
Wide table: scroll sideways to see every column.
| Equipment | Published range | Format | Selection input |
|---|---|---|---|
| CXWSZ containerized sewage treatment | 0.5–10 m³/h per unit | ISO container or skid, 3 × 1.5 × 2 m to 16 × 3 × 3.5 m | Design flow and peak factor |
| CXMBR integrated MBR | 0.5–10 m³/h per unit | Packaged unit, 3.5 × 1.5 × 2 m to 15 × 2.5 × 2.5 m | Effluent quality and reuse target |
| CXCF and CXPF dissolved air flotation | 5–80 m³/h (CXCF); 4–300 m³/h (CXPF) | Tank unit with saturator | Oil, grease and suspended solids load |
| CXDL screw press dewatering | 6–480 kgDS/h | Skid-mounted press | Sludge volume and target cake |
Ranges are reproduced from the published model tables; dimensions and the final configuration are confirmed against the actual build.
Equipment for a Philippine project
The four families below cover municipal, community, resort and food-processing duties. Each card opens the product page with the model table.

Containerized sewage treatment plant
A complete train in ISO containers, delivered to an island site by sea, barge and road.

Integrated MBR equipment
Biological treatment and membrane separation in one unit, where reuse or a small footprint sets the design.

Dissolved air flotation
Micro-bubble flotation ahead of the biological stage for food-processing streams carrying fats, oils and grease.

Sludge dewatering equipment
Screw press, belt press and plate-and-frame units that turn the sludge into a transportable cake.
Why containerized fits the Philippines
Archipelago logistics
Standard ISO containers move by sea to Manila, Cebu or Davao and then by road or barge to the project island; the largest unit and the lifting capacity at the discharge point decide it.
Land constraints
A container plant needs only a small level concrete pad, which suits LGU, resort and urban sites where land is scarce, already developed or has no room for a civil works programme.
Fast deployment
The plant is assembled, piped, wired and tested at the works before shipment, so on-site work is limited to the foundation, the connections, power, water and commissioning.
Relocatable
A plant can be lifted onto a truck and moved to another barangay or site, and capacity is extended with additional containers as the service area grows.
What is included, what is confirmed, what stays with the buyer
The split below is the same for every project; the exact list is fixed in the quotation and the contract, and for a tender it is carried into the bid documents.
Included in our supply
- Treatment train assembled, piped, wired and tested at our factory
- Container or modular enclosure, internals and access points
- Blowers, transfer pumps, dosing sets and the control cabinet
- Drawings, operating manuals, P&ID and electrical drawings, with the final list fixed in the quotation
- Packing list and certificates for export and customs
- Technical specifications prepared for the bid package where the project is tendered
Confirmed with the quotation
- Design flow, influent analysis and the discharge or reuse target
- Number of units, footprint and the outline drawing
- Power supply: voltage, frequency, phases, grid or generator
- Site access: road, barge and lifting capacity at the discharge point
- Shipping terms, port of discharge and the delivery schedule
By the buyer on site
- Level foundation or pad, civil works and drainage
- Inlet and outlet connections to the site network
- Power supply, earthing, water supply and compressed air where required
- Lifting, unloading and internal transport at the site
- Operating permits, the discharge or reuse permit and the DENR process
- BAC schedule, tender reference and bid submission, where the project is publicly bid
- Day-to-day operation, chemicals and sludge disposal
We do not issue permits and we do not guarantee compliance; the permit conditions are confirmed with the authority for the site.
Technical documents and project steps
The sequence below is how a project is fixed from enquiry to commissioning support. Durations are not stated here because they depend on the unit count, the tender schedule and the shipping route. The final document list is fixed with the order and the quotation.
Documents issued with the equipment
- Process description and equipment list for the agreed train
- General arrangement and outline drawings
- P&ID and electrical drawings
- Operation and maintenance manual
- Packing list, certificates and export documents
- Technical specifications for the tender, where required
Project steps
- Enquiry: flow, influent analysis, receiving water class and site access
- Sizing: process train, unit count and outline drawing
- Quotation: scope split, documents and commercial terms
- Tender support: technical specification and written answers to clarifications, where the project is publicly bid
- Manufacturing: assembly, piping, wiring and factory testing
- Packing and shipping: export packing, loading and documents
- Site support: foundation and connection review, then commissioning support
What to send us
- Location, province and the receiving water body
- Design flow (m³/day) and peak flow factor
- Influent quality: COD, BOD, TSS, oil and grease, pH
- Discharge standard or reuse target for the receiving water class
- Power supply: voltage, frequency, phase, grid or generator
- Site access and unloading: road route, barge, crane or forklift capacity
- Project stage (feasibility, design, tender or construction)
- Tender reference or BAC schedule, where the project is already advertised
What moves the budget
The quotation follows the process train and the scope split, not a catalogue price. The factors below are the ones that move it most.
- Design flow and peak factor, which set the number of units
- Influent load: COD, BOD, TSS, fats, oils and grease, and pH
- Discharge or reuse target, which sets membrane and disinfection scope
- Power supply and the degree of automation
- Sea freight, barge or road transfer and the lifting at each point
- Tender and BAC requirements, where the project is publicly bid
- Documentation, inspection and testing scope agreed for the order
- Import duties, taxes and local charges, which are not part of the equipment price unless stated
Send the project data and we will size the train
A flow, an influent analysis and the receiving water class are enough to start.
Go to the inquiry formQuestions we get from Philippines projects
How much wastewater can one unit treat?
The published CXWSZ specification table gives 0.5–10 m³/h per unit. The CXWSZ-20 model row separately lists 20 m³/h and 2 units. Larger flows are met by running several units in parallel or by a custom build. The footprint runs from 3 × 1.5 × 2 m to 16 × 3 × 3.5 m depending on capacity. Send the design flow and peak factor and we will confirm the unit count and configuration.
What power supply does the plant need?
Send the voltage, frequency and number of phases, and say whether the supply is a grid or a generator. Frequency is fixed when the equipment is built: a transformer changes voltage only and cannot change frequency. Where a motor has to run on a different frequency, a variable frequency drive lets it see the frequency it was designed for.
How is a plant delivered to an island site?
Units travel in standard ISO containers by sea to Manila, Cebu or Davao, then by barge or road to the site. The deciding factors are the size of the largest unit, up to 16 × 3 × 3.5 m, and the lifting capacity at the discharge point. A standard dry container is 2.352 m wide inside, so a wider unit needs another route, agreed before the offer.
Can you support an LGU tender?
Yes. For LGU projects we prepare the technical specifications and support the bid document package, so the plant can be compared on equal terms with other compliant offers. The specification states the design flow, the influent characteristics, the process train, the discharge or reuse target and the power supply in the same terms for every bidder. We answer clarifications in writing, and the same documents carry through to the contract and the commissioning checks.
What discharge or reuse standard can the plant meet?
The plant is designed to the standard you specify. The limits depend on the classification of the receiving water body and on the discharge volume, and are confirmed with your DENR office or consultant; we do not issue permits. If the water is to be reused, say so early, because the reuse target changes the process chain.
What do you need to prepare a quotation?
Location, province and receiving water; design flow and peak factor; influent COD, BOD, TSS, oil and grease and pH; the discharge standard or reuse target; voltage, frequency, phase and grid or generator; site access and lifting capacity; and the project stage. For a tender, send the reference and the BAC schedule so the specification can be prepared against it.
