- Home
- Solutions
- Selection and sizing guide
- Food and beverage processing
Selecting a plant for food and beverage processing wastewater.
Process wastewater from food and beverage lines is stronger and more variable than domestic sewage. The plant is sized on the waste stream first, then on the flow.

Which processors
Dairy
milk, cheese and yoghurt lines, where the organic load is high and cleaning water adds volume and caustic or acidic wash liquor that has to be levelled before the biology.
Meat and slaughterhouse
high-strength wastewater carrying blood, solids and grease, with a load that arrives with the kill schedule rather than evenly across the day.
Beverage
brewing, bottling and juice plants, where the flow varies with the filling schedule and wash-down water adds both volume and organic matter.
Fruit and vegetable
washing and peeling water carrying soil and organic solids, often with a seasonal peak that is much higher than the annual average.
Bakery
process and cleaning wastewater with fats and suspended solids, where the grease has to be removed early so it does not coat the equipment downstream.
Seafood
processing water that can carry salinity as well as organic load, so the biology may need acclimatisation and the discharge limits need checking.
What makes this wastewater different
The character of the waste stream, rather than its volume, is what usually decides the process train.
- High organic load — process water carries far more organic matter than domestic sewage of the same volume, so the biological stage and its aeration are sized on the load rather than on the flow.
- Fats, oils and grease (FOG) — grease from cooking and cleaning coats equipment and pipelines, and has to be removed before the biology so it does not blind membranes or blanket the biomass.
- High suspended solids — solids from product handling and washing load the front of the plant, so screening and flotation carry a duty a domestic plant would not see.
- Variable and batch flow — discharge follows the production schedule, not a steady daily pattern, so equalization has to absorb the peaks and the gaps between them.
- pH swings — cleaning chemicals can push the waste stream acidic or alkaline within a single shift, and the biology is sensitive to both, so pH is corrected before the biological stage.
- Possible salinity — seafood and brine processing can add salt that affects the biology, so the chloride level is measured before the process is fixed.
Pre-treatment first
Fat, solids and grease are removed before the biology, because the biological stage is sized on what reaches it.
- 1Screening — remove coarse solids and debris before they reach the process.
- 2Grease removal — separate fats, oils and grease so they do not load the biological stage.
- 3Dissolved air flotation (DAF) — lift fine solids and remaining grease to the surface for removal.
- 4Biological treatment — A/O or MBBR for organic and nitrogen removal, or MBR where a compact footprint and a higher effluent quality are needed.
Selection steps
- 1Characterize the waste stream — flow pattern, organic load, grease, solids and pH come first.
- 2Size pre-treatment and the biology — equalization, grease removal and DAF where needed, then the biological stage.
- 3Set the discharge or reuse target — the required standard and any reuse intent decide the final treatment step.
What to send us
- Design flow (m³/day) and the flow pattern.
- COD, BOD₅, FOG, TSS, pH and temperature.
- Oil and grease concentration, and the cleaning chemicals used on the lines.
- Seasonality — how production, and therefore discharge, changes through the year.
- Production schedule — shifts, batch times and wash-down windows.
- Discharge standard.
- Reuse intent — irrigation, landscaping or process water.
- Site data — available footprint and the power supply (V / Hz / phase).
Selection input template
Download the editable Excel template for this page, fill in your site data, and send it back to us.
Reuse option
Where reuse is the objective, the plant can be configured to produce water suitable for a non-potable duty. The reuse target is fixed during sizing, together with the treatment step needed to reach it.
Irrigation
water for on-site or nearby irrigation where reuse is permitted.
Landscaping
water for grounds and green areas around the plant.
Process water
water returned to selected non-potable duties inside the plant.
Questions we answer on food and beverage projects
Why is food wastewater sized on load rather than flow?
A cubic metre of process water can carry many times the organic matter of the same volume of domestic sewage. COD, BOD₅ and grease decide how much biological capacity, aeration and sludge handling the plant needs; flow decides tank volume and residence time. On strong streams the load check comes out larger, and the load governs the design.
What pre-treatment will the plant need?
Screening removes coarse solids, grease removal takes out fats, oils and grease, dissolved air flotation removes fine suspended solids and the remaining grease where the stream needs it, and an equalization tank levels the flow and the quality between shifts. Which of these are needed follows from the waste stream, not from a standard package.
Should I choose MBBR or MBR?
MBBR holds the biology as a biofilm on moving carriers and suits high organic loads without a membrane. MBR adds membrane separation, which gives a small footprint and a water quality suitable for reuse. The discharge standard, the reuse intent and the space available decide between them; neither is a default.
Can the plant handle batch discharges and pH swings?
Yes, provided the design knows about them. The equalization tank is sized to level the flow between shifts or batches, and pH is corrected before the stream reaches the biology. Send the flow pattern and the pH range as design inputs, because a plant sized on a steady average will be under-sized for a batch discharge.
What data do you need to size the plant?
Flow and the flow pattern; COD, BOD₅, FOG, TSS, pH and temperature; how production — and therefore discharge — changes through the year; the discharge standard; and whether the water is to be reused. Those inputs fix the pre-treatment, the biological stage and the final treatment step.