Sizing a plant to your flow and standard.

Selection is driven by two loads — hydraulic flow and organic load — and constrained by the discharge standard you have to meet. Send us the inputs below and we return a sized configuration.

A circular clarifier with its scraper bridge

What we need to size your plant

  • Daily flow (m³/day)
  • Peak flow factor
  • Influent characteristics: COD, BOD₅, TSS, NH₃-N, oil & grease, pH, temperature
  • Target discharge standard
  • Reuse intent (irrigation, flushing, or discharge only)
  • Power supply (V / Hz / phase)
  • Climate and ambient temperature range
  • Available footprint
  • Discharge point (receiving water body, soakaway or sewer)
  • Site access for container delivery
  • Oil and grease concentration, and the wastewater temperature range
  • Lifting and crane capacity at the delivery point

How the sizing works

  1. 1Size on hydraulic load. Daily flow and peak flow factor set the hydraulic residence time and the tank volumes, because the tanks must hold the water long enough for treatment even on the day the flow peaks.
  2. 2Size on organic load. COD and BOD₅ set the biological capacity, because the biology has to oxidise the mass arriving each day; this often governs the plant size for high-strength wastewater such as food processing.
  3. 3Convert to containers. Divide the required capacity by the capacity of one container to get the number of units. One unit covers 12–240 m³/day; larger flows run several units in parallel or a plant built to suit.
  4. 4Fix the process train. A/O or MBBR, with or without MBR, follows from the discharge standard and the reuse intent, because the standard fixes how far the treatment has to go and a reuse target can add a membrane step.
  5. 5Check the site. Footprint and access decide whether the plant arrives as a single container or as a linked train, since the delivery route and the lifting available at the site limit the size of each unit.

Containerized plant vs on-site civil construction

AspectContainerized plantOn-site civil construction
Where it is builtShop-fabricatedBuilt on site
On-site installation workMinimal — foundation, piping, power, commissioningExtensive — civil, structural and mechanical/electrical works
FootprintCompact, on a small concrete padLarger, with fixed basins
RelocatabilityCan be moved to another siteEffectively fixed
Future expansionAdd containers as the flow growsRequires new civil works
Quality controlAssembled and tested under workshop conditionsDepends on site conditions and supervision
Civil works requiredMinimalExtensive

Skid-mounted vs containerized vs civil works: which one ships

Example of the inputs we ask for

Replace each placeholder with your own value.

Daily flow[your value] m³/day
Peak flow factor[your value]
Influent COD[your value] mg/L
Influent BOD₅[your value] mg/L
Influent TSS[your value] mg/L
Discharge standard[your value]
Power supply[your value] V / Hz / phase
Available footprint[your value] m²

Selection input template

Download the editable Excel template for this page, fill in your site data, and send it back to us.

Look-up charts behind the sizing method

The method above runs on a set of selection charts — population to capacity, peaking factor Kz, container loading, influent quality, effluent standards to process train, and tank volume with HRT. Every figure is labelled with the standard or statistic it comes from.

Selection questions we answer most often

What is the difference between sizing on flow and on load?

Sizing on flow uses the daily volume and the peak factor to set tank volume and hydraulic residence time. Sizing on load uses the COD and BOD₅ arriving each day to set the biological capacity — the biomass, the aeration and the sludge it produces. The two checks usually give different answers, and the larger one governs; a high-strength waste stream is often controlled by the load.

How many container units will I need?

One unit covers 12–240 m³/day, depending on the model. Divide the required capacity by the capacity of the unit you are considering and round up; where the flow exceeds a single unit, units run in parallel or the plant is built to suit. The number also follows the process train and the footprint, so it is confirmed at sizing rather than guessed from flow alone.

Do I need MBR?

Choose MBR where the treated water is reused, where the footprint is tight, or where the discharge standard is demanding on solids and ammonia. Where none of those applies, an A/O or MBBR train with a clarifier usually reaches a less demanding target with simpler operation. The discharge standard and the reuse intent decide it, not the flow.

What if I only know the population to be served?

You need the source of the allowance, not one generic figure. The GB tables are highest-day water-use allowances: use the residential Table 4.0.3-1 row or the combined domestic Table 4.0.3-3 row, never a mixture; apply the 90% conversion (GB 50014-2021 §4.1.14), multiply by the served population and divide by 1000. That gives a highest-day flow estimate, which cannot be multiplied directly by the average-day Kz — convert the time basis first or use a peak method for the highest day. The UK small-system figure is already a daily sewage flow for up to 1,000 people, so do not apply 90% to it, and the US onsite basis is a single-household note rather than a municipal lookup. The chart worked example uses the residential Zone 2 medium-city band and an explicit 120 L assumption.

Can the plant be expanded after commissioning?

Yes. Capacity is added by bringing in further container modules and connecting them to the existing train. Expansion is cheaper when it is anticipated: the space for the next unit, the pipe connections and the electrical capacity are reserved in the first layout, so the later work is a connection rather than a rebuild.

How are configuration and pricing determined?

Published model tables are selection references, not fixed-scope package prices. We confirm the process train and equipment configuration from your water source and analysis, design flow, treated-water or discharge target, site conditions and scope of supply. The quotation then sets out the equipment, options, included scope and exclusions. If a water analysis is not yet available, start with the water source, application, required flow and treatment target; the remaining inputs can be clarified during sizing.

Tell us what the site has to treat.

Contact details
Tell us about your project