Selection look-up charts.

Seven tables we work from. Each names the type of source behind its figures: a national standard or regulation, an official or industry guide, operating statistics, or our own design values and calculation rules. The type tells you where a number comes from; it is not a reliability grade.

Aerial view of a circular clarifier at a wastewater treatment plant

The seven charts

What kind of source is behind each figure?

Each chart names the source type behind its figures. The types describe where a number comes from; they are not ranked and carry no A–E grade.

National standard and regulation
A clause, a table value or a limit set out in a national standard or regulation — GB 50014-2021, GB 50013-2018, GB 18918-2002, GB 39707-2020 or HJ 576-2010, for example.
Official or industry guide
A value from an official or industry-authoritative design guide rather than a mandatory standard — British Water, US EPA or Saudi MEWA.
Operating statistics
A figure from operational data, such as a survey of treatment plants. It describes what plants receive or consume; it is not a standard value and is not presented as one.
Our design values and engineering rules
A first-party design value, carrier container data or our own calculation rule — the CXMWI medical-waste design values, container dimensions and net-load estimates, packing allowances and the 2.2 m route-classification threshold. These are not third-party certifications.

How to use the charts together

  1. 1Start from population or flow. Use the population to capacity chart to derive a highest-day flow estimate from the GB allowances, or take the design flow from the project brief; state the time basis before applying a peaking factor.
  2. 2Apply the peaking factor to the average daily combined domestic sewage flow (not the industrial or infiltration components) to get the peak flow. Size hydraulic channels and pipes on the peak; design biological tanks on the average flow, load and solids retention time and make a peak hydraulic check; size equalization tanks from a flow hydrograph.
  3. 3Check the influent load. Use measured project data where it exists; the chart's survey statistics describe municipal sewage, and high-strength or industrial wastewater needs its own sampling before the process is sized.
  4. 4Pick the process train from the effluent standard. Move from the discharge grade to the process combination that normally delivers it; that combination is a candidate, not a guarantee, so confirm it with the project design before sizing.
  5. 5Size the tanks. Use the tank volume chart with V = Q × HRT to turn the process train into volumes, and check the solids retention time against the phosphorus-removal or combined nitrogen and phosphorus target.
  6. 6Convert to containers for shipment. Use the container loading chart to estimate how many units fit; the result is a theoretical loading estimate, not a shipping commitment, so confirm the actual door opening, route and booking before quoting.