Wastewater treatment plants for Mexico: what defines the project.

Containerized and modular plants for municipal operators, hotels, industrial parks and food processors in Mexico — designed and supplied to the discharge or reuse target you specify, built for 60 Hz and shipped with Spanish-language documentation.

NOM-001-SEMARNAT-2021 and NOM-003 framework60 Hz motors, controls and instrumentsSpanish drawings and operating manuals

Send the design flow, an influent analysis and the discharge or reuse target.

A containerised MBR module on our factory floor

Scenarios we configure for

Municipal

Municipal and community systems

Town, development and clustered-community plants: capacity is set from the served population, the per-capita allowance and the peak factor, then built as container or modular units on a small pad. Additional units cover a later phase without rebuilding the civil works.

Resort

Hotels and resorts

A seasonal flow that swings between low and full occupancy, on a site where land is expensive: the train is sized on the peak week, with MBR and disinfection where treated water is reused for irrigation or landscaping.

Industrial

Industrial parks

Several tenants discharging into one plant: each stream is characterized separately, equalization absorbs the batch discharges, and pretreatment is set per stream before the shared biological stage. Capacity is added module by module as tenants connect.

Industrial

Food processing and slaughterhouses

High organic load, fats, oils and grease, solids and pH swings: screening, grease removal, dissolved air flotation and equalization ahead of A/O, MBBR or MBR, with the biological stage sized on COD and BOD rather than on population.

Community

Remote and rural communities

Sites with no central sewer and no room for a civil-works programme: a packaged train that arrives assembled, needs a level pad and a power connection, and can be relocated if the settlement moves.

Medical

Hospitals and clinics

On-site treatment where the effluent has to be reliable and disinfected: the train is scoped around the ward load and the discharge or reuse route agreed with the site.

The framework: NOM-001-SEMARNAT-2021 and NOM-003-SEMARNAT

NOM-001-SEMARNAT-2021 was published in the Diario Oficial de la Federación on 11 March 2022 and replaced the 1996 edition. It applies to those responsible for discharges into receiving waters owned by the nation. It does not apply to discharges that go only to a storm sewer, or directly into a municipal sewer. The receiving water is classified in four groups: rivers, streams, canals and drains; reservoirs, lakes and lagoons; Mexican marine zones; and soil, including irrigation of green areas, infiltration and karst. Tables 1 and 2 and the specification annex took effect on 3 April 2023; colour and acute toxicity take effect in the fourth year after publication, on 11 March 2026. The general entry into force was 365 days after publication.

NOM-003-SEMARNAT-1997 was published on 21 September 1998 and applies to treated wastewater reused in services to the public. It separates direct-contact reuse from indirect or occasional-contact reuse, and its indicator framework covers parameters such as faecal coliforms, helminth eggs, grease, BOD5 and TSS, with no floating matter left in the storage or distribution system. We do not reproduce its table values here. Where reuse is part of the project, the reuse category changes the process train and the disinfection step, so it is worth fixing at the enquiry stage. The current status of the standard should be confirmed with the authority that applies to the project site.

The limits that govern a project depend on the receiving water classification, the discharge volume and the permit for that site. We design and supply to the standard the client specifies; we do not issue permits and we do not guarantee compliance. Confirm the current text of the standard and the permit conditions with SEMARNAT, the state or municipal authority, or your consultant.

Matching the process chain to the application

The rows below are the configurations we size most often. The final train is fixed once the flow, the influent analysis and the discharge or reuse target are known.

Wide table: scroll sideways to see every column.

ApplicationWhat sets the loadPre-treatmentCore processReuse or sludge
Municipal and communityPopulation, per-capita allowance and peak factorScreening, grit removal, equalizationA/O or MBBR; MBR where the footprint is tightDisinfection before discharge; sludge dewatering
Hotels and resortsPeak-week occupancy and seasonal swingScreening, grease removal, equalizationMBR for a compact footprintDisinfection for irrigation or landscaping; sludge dewatering
Industrial parksEach tenant stream characterized separatelyPer-stream pretreatment and equalizationShared A/O, MBBR or MBRReuse where the park requires it; sludge dewatering
Food processing and slaughterhousesHigh COD and BOD, fats, oils and grease, pH swingsScreening, grease removal, DAF, equalizationA/O, MBBR or MBR sized on the organic loadIrrigation where permitted; sludge dewatering
Remote and rural communitiesNo central sewer and limited civil worksScreening and equalization in the containerA/O or MBBR; MBR where reuse is requiredDisinfection; sludge handling by the operator

A container or modular unit carries the process; the number of units follows the design flow and the peak factor.

Published equipment ranges

These are the published ranges of the equipment families we build. They are not a selection; the unit count and the process train are confirmed against the project data.

Wide table: scroll sideways to see every column.

EquipmentPublished rangeFormatSelection input
CXWSZ containerized sewage treatment0.5–10 m³/h per unitFactory-assembled unit or skid, 3 × 1.5 × 2 m to 16 × 3 × 3.5 mDesign flow and peak factor
CXMBR integrated MBR0.5–10 m³/h per unitPackaged unit, 3.5 × 1.5 × 2 m to 15 × 2.5 × 2.5 mEffluent quality and reuse target
CXCF and CXPF dissolved air flotation5–80 m³/h (CXCF); 4–300 m³/h (CXPF)Tank unit with saturatorOil, grease and suspended solids load
CXDL screw press dewatering6–480 kgDS/hSkid-mounted pressSludge volume and target cake

Ranges are reproduced from the published model tables; dimensions and the final configuration are confirmed against the actual build.

Why a containerized or modular plant fits a Mexican project

Port to site delivery

Units are shipped to a Mexican port and then moved by road to the site; the transport arrangement is confirmed against the packed dimensions. The largest single unit and the lifting capacity at the discharge point decide the route, so both are checked before the offer. Drawings, operating manuals and labels are issued in Spanish, and the packing list and certificates are prepared for customs clearance.

Built for 60 Hz

The Mexican grid runs at 60 Hz. Frequency is fixed when the equipment is built: a transformer changes voltage only and cannot change frequency. Motors, controls and instruments are specified for 60 Hz, and the enquiry should state voltage, number of phases and whether the supply is grid or generator.

Reuse where water is short

Where treated water is reused for irrigation or landscaping, the plant can be configured with MBR and disinfection. The reuse category sets the quality the train has to reach, and NOM-003 is the framework the project is checked against.

Small footprint, room to expand

The plant arrives assembled, piped, wired and tested, so site work is the pad, the connections, power, water and commissioning. Capacity is extended by adding modules or containers as the population or the tenant load grows, instead of rebuilding basins in situ.

What is included, what is confirmed, what stays with the buyer

The split below is the same for every project; the exact list is fixed in the quotation and the contract.

Included in our supply

  • Treatment train assembled, piped, wired and tested at our factory
  • Container or modular enclosure, internals and access points
  • Blowers, transfer pumps, dosing sets and the control cabinet
  • Spanish drawings, operating manuals, P&ID and electrical drawings
  • Packing list and certificates prepared for customs clearance

Confirmed with the quotation

  • Design flow, influent analysis and discharge or reuse target
  • Number of units, footprint and the outline drawing
  • Power supply: voltage, phases, 60 Hz, grid or generator
  • Scope of the factory acceptance test and the documents issued with it
  • Shipping terms, port of discharge and the delivery schedule

By the buyer on site

  • Level foundation or pad, civil works and drainage
  • Inlet and outlet connections to the site network
  • Power supply, earthing, water supply and compressed air where required
  • Lifting, unloading and internal transport at the site
  • Operating permits and the discharge or reuse permit
  • Day-to-day operation, chemicals and sludge disposal

We do not issue permits and we do not guarantee compliance; the permit conditions are confirmed with the authority for the site.

Technical documents and project steps

The sequence below is how a project is fixed from enquiry to commissioning support. Durations are not stated here because they depend on the unit count, the document review and the shipping route.

Documents issued with the equipment

  • Process description and equipment list for the agreed train
  • General arrangement and outline drawings
  • P&ID and electrical drawings
  • Operation and maintenance manual in Spanish
  • Packing list, certificates and customs documents

Project steps

  1. Enquiry: flow, influent analysis, discharge or reuse target and site data
  2. Sizing: process train, unit count and outline drawing
  3. Quotation: scope split, documents and commercial terms
  4. Manufacturing: assembly, piping, wiring and factory testing
  5. Packing and shipping: export packing, loading and documents
  6. Site support: foundation and connection review, then commissioning support

What we need to quote

  • Design flow (m³/d) and peak factor
  • Wastewater type, and the flow of each stream where several are mixed
  • Influent and effluent targets: BOD5, COD, TSS, nitrogen, phosphorus, coliforms, or an existing analysis
  • Project location and the receiving water body, or the reuse application
  • Power supply: voltage, phases, 60 Hz, grid or generator
  • Site conditions: available area, access and lifting, ambient temperature range
  • Project stage: feasibility, design, tender or construction

What moves the budget

The quotation follows the process train and the scope split, not a catalogue price. The factors below are the ones that move it most.

  • Design flow and peak factor, which set the number of units
  • Influent load: COD, BOD, TSS, fats, oils and grease, and pH
  • Discharge or reuse target, which sets membrane and disinfection scope
  • Material and equipment selection for the wetted parts and the enclosure
  • Power supply and the degree of automation
  • Site access, lifting and the shipping route to the port of discharge
  • Documentation, inspection and testing scope agreed for the order
  • Import duties, taxes and local charges, which are not part of the equipment price unless stated

Send the project data and we will size the train

A flow, an influent analysis and the discharge or reuse target are enough to start.

Go to the inquiry form

Questions we get from Mexico projects

Which limits does the plant have to meet?

The project is checked against NOM-001-SEMARNAT-2021 for discharge and, where water is reused in services to the public, against the NOM-003 framework. The applicable limits depend on the receiving water class, the discharge volume and the permit for the site. Send the target and the receiving water, and the train is sized to the standard you specify; the permit conditions are confirmed with the authority.

Is the plant built for 60 Hz?

Yes. Frequency is fixed at build, so the equipment is specified for 60 Hz from the start. Send the voltage, the number of phases and whether the supply is grid or generator, and the motor and control list is issued against it.

Containerized or modular — which one?

A containerized unit describes the equipment enclosure and delivery format; its dimensions and transport method are confirmed for the project. A modular unit is the capacity format: more modules are added as the flow grows. Most projects use both — containerized process units on a modular layout that leaves room for the next phase.

What documents arrive with the equipment?

Spanish-language drawings and operating manuals, the P&ID, the electrical drawings, the packing list and the certificates needed for customs clearance. The exact document list is fixed with the order, because the importer and the customs broker may ask for additional items.

Is NOM-003 reuse covered?

Where treated water is reused in services to the public, the reuse category sets the process train: direct-contact reuse needs a higher level of treatment and disinfection than indirect or occasional contact. Tell us the reuse application at the enquiry stage so the train is configured for it.

What do you need for a quotation?

Design flow and peak factor, wastewater type, influent and effluent targets, project location and receiving water or reuse application, voltage and phases at 60 Hz, site conditions and project stage. With those, the train and the unit count can be fixed.

Get a configuration and quotation for your project

Share what you know about the wastewater, flow and project location. We will review the information and confirm what else is needed for a quotation. You can leave details blank if they are not yet known.

Contact details
Wastewater treatment