Containerized wastewater treatment for Saudi projects.

Pre-assembled plants for remote, industrial, camp and municipal sites — shipped in standard ISO containers and commissioned on site, with water reuse in mind.

Reuse-ready MBR and disinfectionHigh ambient temperature specificationRemote-site logistics and factory testing

Send the design flow, the influent analysis, the reuse or discharge target and the ambient temperature range.

A dissolved air flotation unit on our factory floor

Segments we serve

Industrial

Remote and industrial sites

Facilities operating away from a central sewer: a packaged train in ISO containers, with the process and the container envelope specified for the ambient temperature range at the site.

Camp

Labour and construction camps

Temporary camps that need treatment during the works and relocation afterwards: a container plant on a small pad, moved to the next site when the camp closes and recommissioned there.

Industrial

Oil and gas facilities

Two streams are separated before the process is chosen: accommodation and domestic sewage can be evaluated for A/O, MBBR or MBR, while oily process water must first be characterized and its treatability reviewed; the dedicated pretreatment and final train are then fixed from the analysis, not assumed.

Municipal

Municipal and community

Town and community facilities serving a defined population: capacity set from population, per-capita allowance and peak flow factor, then converted into container units.

Resort

Coastal resorts

Properties that need reliable treatment independent of a central sewer, with MBR where the permeate is reused for irrigation and landscaping and the footprint is limited.

Regulatory context

Discharge to environmental media is controlled by the National Center for Environmental Compliance (NCEC) under the Executive Regulations for the Protection of Aqueous Media from Pollution. Coastal and marine water, surface water, and soil or land use different limit tables, with averaging periods attached. MEWA publishes the regulation; collection and reuse can also involve the water-sector authorities. Reuse quality is a separate approval question, so irrigation or landscaping intent must be fixed before the process chain and disinfection step are selected.

Requirements depend on the discharge point, the reuse application and the receiving environment. Please confirm the standard applicable to your project with the relevant authority or your consultant.

Matching the process chain to the application

The rows below cover the duties we size most often in Saudi Arabia. The final train is fixed once the flow, the influent analysis, the reuse or discharge target and the ambient temperature range are known.

Wide table: scroll sideways to see every column.

ApplicationWhat sets the loadPre-treatmentCore processReuse or sludge
Remote and industrial sitesSite load and ambient temperature rangeScreening, grease removal, equalizationA/O or MBBR; MBR where reuse is requiredDisinfection; sludge dewatering
Labour and construction campsTemporary population and relocationScreening and equalization in the containerA/O or MBBRDisinfection; sludge handling by the operator
Oil and gas sites: domestic sewage and oily process waterStream type first: accommodation and domestic flow, or oily process water; then load and variabilityDomestic sewage: screening and equalization; oily process water: characterization and treatability review, then dedicated pretreatmentDomestic sewage: A/O, MBBR or MBR; oily process water: final train fixed by the analysis, not a generic biological chainReuse where the treated stream allows; sludge and residual oil handling per analysis
Municipal and communityPopulation, per-capita allowance and peak factorScreening, grit removal, equalizationA/O or MBBR; MBR where reuse is requiredDisinfection; sludge dewatering
Coastal resortsPeak occupancy and limited landScreening, grease removal, equalizationMBR for a compact footprintDisinfection for irrigation and landscaping; sludge dewatering

A container unit is the transport format; the number of units follows the flow and the peak factor.

Published equipment ranges

These are the published ranges of the equipment families we build. They are not a selection; the unit count and the process train are confirmed against the project data.

Wide table: scroll sideways to see every column.

EquipmentPublished rangeFormatSelection input
CXWSZ containerized sewage treatment0.5–10 m³/h per unitISO container or skid, 3 × 1.5 × 2 m to 16 × 3 × 3.5 mDesign flow and peak factor
CXMBR integrated MBR0.5–10 m³/h per unitPackaged unit, 3.5 × 1.5 × 2 m to 15 × 2.5 × 2.5 mEffluent quality and reuse target
CXCF and CXPF dissolved air flotation5–80 m³/h (CXCF); 4–300 m³/h (CXPF)Tank unit with saturatorOil, grease and suspended solids load
CXDL screw press dewatering6–480 kgDS/hSkid-mounted pressSludge volume and target cake

Ranges are reproduced from the published model tables; dimensions and the final configuration are confirmed against the actual build.

Why containerized fits Saudi Arabia

Remote-site logistics

Standard ISO containers move by sea and road to sites far from a central sewer. The largest unit is up to 16 × 3 × 3.5 m, so the route and lifting capacity are checked before the offer.

High ambient temperature

The process train and the container envelope are specified for the ambient temperature range. Give us the highest and lowest ambient temperature, because it affects ventilation, insulation and equipment rating, and the water temperature affects the biology.

Water reuse

Where reuse is the objective, the plant can be configured with MBR and disinfection to produce water suitable for irrigation and landscaping, and the reuse target then sets the process chain.

Fast deployment

The plant is assembled, piped, wired and tested at the works before shipment, and a factory acceptance test is completed, so on-site work is limited to the foundation, the connections, power, water and commissioning.

What is included, what is confirmed, what stays with the buyer

The split below is the same for every project; the exact list is fixed in the quotation and the contract.

Included in our supply

  • Treatment train assembled, piped, wired and tested at our factory
  • Container or modular enclosure, internals and access points
  • Blowers, transfer pumps, dosing sets and the control cabinet
  • Drawings, operating manuals, P&ID and electrical drawings, with the final list fixed in the quotation
  • Factory acceptance test records
  • Packing list and certificates for export and customs

Confirmed with the quotation

  • Design flow, influent analysis and the reuse or discharge target
  • Number of units, footprint and the outline drawing
  • Power supply: voltage, frequency, phases, grid or generator
  • Highest and lowest ambient temperature, and the water temperature range
  • Scope of the factory acceptance test and the documents issued with it
  • Shipping terms, port of discharge and the delivery schedule

By the buyer on site

  • Level foundation or pad, civil works and drainage
  • Inlet and outlet connections to the site network
  • Power supply, earthing, water supply and compressed air where required
  • Lifting, unloading and internal transport at the site
  • Heavy-transport permits, operating permits and the reuse or discharge permit
  • Day-to-day operation, chemicals and sludge disposal

We do not issue permits and we do not guarantee compliance; the permit conditions are confirmed with the authority for the site.

Technical documents and project steps

The sequence below is how a project is fixed from enquiry to commissioning support. Durations are not stated here because they depend on the unit count, the factory acceptance test and the shipping route. The final document list is fixed with the order and the quotation.

Documents issued with the equipment

  • Process description and equipment list for the agreed train
  • General arrangement and outline drawings
  • P&ID and electrical drawings
  • Operation and maintenance manual
  • Factory acceptance test records
  • Packing list, certificates and customs documents

Project steps

  1. Enquiry: flow, influent analysis, reuse or discharge target and ambient temperature range
  2. Sizing: process train, unit count and outline drawing
  3. Quotation: scope split, documents and commercial terms
  4. Manufacturing: assembly, piping, wiring and factory testing
  5. Factory acceptance test: records issued with the shipment
  6. Packing and shipping: export packing, loading and documents
  7. Site support: foundation and connection review, then commissioning support

What to send us

  • Region and site location
  • Design flow (m³/day) and peak flow factor
  • Influent quality: COD, BOD, TSS, oil and grease, pH
  • Discharge or reuse target (irrigation, landscaping, discharge)
  • Power supply: voltage, frequency, phase, grid or generator
  • Ambient temperature range: highest and lowest
  • Site access and unloading: road route, crane or forklift capacity, and any permit for heavy transport
  • Project stage: feasibility, design, tender or construction, with the required completion date if fixed

What moves the budget

The quotation follows the process train and the scope split, not a catalogue price. The factors below are the ones that move it most.

  • Design flow and peak factor, which set the number of units
  • Influent load: COD, BOD, TSS, oil and grease, and pH
  • Reuse or discharge target, which sets membrane and disinfection scope
  • Ambient temperature range and the enclosure, ventilation and equipment rating it requires
  • Power supply and the degree of automation
  • Road route, heavy transport and the lifting at the site
  • Factory acceptance test, documentation and inspection scope agreed for the order
  • Import duties, taxes and local charges, which are not part of the equipment price unless stated

Send the project data and we will size the train

A flow, an influent analysis, the reuse or discharge target and the ambient temperature range are enough to start.

Go to the inquiry form

Questions we get from Saudi projects

How much wastewater can one unit treat?

The published CXWSZ specification table gives 0.5–10 m³/h per unit. The CXWSZ-20 model row separately lists 20 m³/h and 2 units. Larger flows are met by running several units in parallel or by a custom build. The footprint runs from 3 × 1.5 × 2 m to 16 × 3 × 3.5 m depending on capacity. Send the design flow and peak factor and we will confirm the unit count and configuration.

What power supply does the plant need?

Send the voltage, frequency and number of phases, and say whether the supply is a grid or a generator. Frequency is fixed when the equipment is built: a transformer changes voltage only and cannot change frequency. Where a motor has to run on a different frequency, a variable frequency drive lets it see the frequency it was designed for.

How is a plant delivered to a remote site?

Units travel in standard ISO containers by sea and then by road to the site. The deciding factors are the size of the largest unit, up to 16 × 3 × 3.5 m, the road route and the lifting capacity at the unloading point. A standard dry container is 2.352 m wide inside, so a wider assembled unit needs another shipping route, agreed before the offer.

How does high ambient temperature affect the plant?

The process train and the container envelope are specified for the ambient temperature range at the site. The highest and lowest ambient temperature affect ventilation, insulation and equipment rating, and the water temperature affects the biology. Give both ranges at the enquiry stage so they enter the design rather than being corrected after the offer.

Can the treated water be reused?

Yes, where reuse is the objective. The plant can be configured with MBR and disinfection for irrigation or landscaping, and the reuse target sets the process chain. The limits depend on the receiving environment, the discharge volume and the reuse application, and are confirmed with MEWA, the National Water Company or your consultant; we do not issue permits. For discharge, the receiving environment sets the limits.

What do you need to prepare a quotation?

Region and site location; design flow and peak factor; influent COD, BOD, TSS, oil and grease and pH; the discharge or reuse target; voltage, frequency, phase and grid or generator; the highest and lowest ambient temperature; site access and lifting capacity; and the project stage. With those we can size the train and the number of units.

Tell us what the site has to treat.

Contact details
Tell us about your project