Selecting a plant for chemical and pharmaceutical wastewater.
Treatability is the first question, not flow. What the molecule does to the biology decides the train, and a laboratory result decides it — not a catalogue.

Which streams
Chemical synthesis and bulk chemicals
reaction water, wash water and mother liquor, where the composition changes with the product campaign.
Pharmaceutical and API manufacturing
low volume, high concentration, with solvents and active ingredients the biology has to be protected from.
Agrochemical formulation
pesticide and fertiliser formulation water carrying active substances and surfactants.
Dye and pigment production
colour, salt and aromatic compounds, often with a fraction that the biology cannot break down.
Cosmetics and personal care
surfactants, oils and preservatives in a stream with a high and variable organic load.
Laboratory and pilot-plant effluent
small volumes of concentrated, variable and sometimes toxic waste that cannot go to the main flow untreated.
What makes this wastewater different
The volume says very little about the difficulty. On chemical streams, treatability is a property of the molecule and of the concentration, not of the cubic metre.
- Treatability varies with the molecule — a cubic metre of one stream can be easier to treat than a tenth of a cubic metre of another, so the analysis matters more than the flow.
- The BOD to COD ratio is the first screen — it says how much of the organic load the biology can reach, and it decides whether a biological stage alone is enough.
- Salinity — high chloride or total dissolved solids limit the biology and can rule out membrane reuse without a further step.
- Toxicity and inhibition — solvents, heavy metals and biocides can stop the biology, so the inlet has to be protected by pre-treatment or by controlled dosing.
- Campaign production — the stream changes when the product changes, so the plant is designed for a range of compositions rather than for one analysis.
- A treatability test comes before the quotation — on this kind of stream a quotation without a test is a guess.
Where the plant starts
The concentrated streams are handled first and separately, then the main flow is brought to something the biology can accept.
- 1Segregation of concentrated streams — keep the small, strong streams out of the main flow so they can be treated by the route they need.
- 2Equalization — level the campaign discharge in volume and in composition, so the biology is not asked to follow the product change.
- 3Neutralisation and precipitation — correct the pH and remove metals as hydroxide or sulphide where they are present.
- 4Oxidation where the stream is recalcitrant — Fenton or another advanced oxidation step where the BOD to COD ratio says the biology cannot reach the load.
- 5Coagulation, flocculation and flotation — remove fine solids, colloids and colour before the biology.
- 6Biological treatment with acclimatisation — MBBR or MBR, fed at a rate the biomass can accept rather than at the peak the campaign produces.
- 7Polishing — activated carbon, filtration or membrane separation for colour, residual organics or a reuse duty.
Selection steps
- 1Screen treatability — the BOD to COD ratio, the salinity, the pH and the inhibition risk say whether a biological route is possible at all.
- 2Run a treatability or jar test — the dosage, the removal and the sludge production are measured, not assumed.
- 3Fix the train against the permit — pre-treatment, biology and polishing sized on the measured result.
What to send us
- Flow and a full analysis for each stream — COD, BOD₅, TSS, TDS or chloride, pH and temperature.
- The solvents, active substances or metals present, with their concentration.
- The production campaign — which products, in what sequence, and how long each runs.
- The permit limits and the discharge point.
- Any existing treatment and its measured performance.
- Whether reuse is intended, and for what duty.
- The sludge and concentrate route — how the residues will leave the site.
- Site data — footprint, access, and the power supply (V / Hz / phase).
Reuse option
Reuse on this kind of stream is decided by the salt and the residual organics, not by the flow. Where the target allows it, membrane separation and carbon polishing follow the biology; where it does not, the stream is treated to discharge.
Non-potable process water
returned to duties that do not need potable water, where the salt balance allows it.
Wash water
cleaning duties agreed with the production side.
Grounds and landscaping
irrigation where reuse is permitted and the quality is met.
Questions we answer on chemical projects
Can you quote before a treatability test?
Not a firm quotation. We can outline the possible trains on the analysis you send and say what the test has to answer; the quotation follows the test, because on these streams the dosage and the removal decide the equipment and the operating cost.
What BOD to COD ratio can be treated biologically?
The ratio is the first screen rather than a pass mark. It says how much of the organic load the biology can reach; where it says a large part cannot, an oxidation or adsorption step is added before or after the biological stage. The article on this site sets out how we read the ratio.
How is salinity handled?
By measuring it first. High chloride or total dissolved solids limit the biology and rule out membrane reuse without a further step. Sometimes the answer is segregation — keeping the saline stream out of the main flow — rather than treating the whole discharge for it.
What if the effluent is toxic to the biology?
The biology is protected at the front of the plant: the toxic stream is pre-treated on its own, or dosed into the main flow in controlled amounts, or kept out of it entirely. Which of these applies is decided by the analysis and by the treatability test.
What happens to the concentrate and the sludge?
They leave the site, and the route is fixed during sizing rather than after commissioning. On chemical streams this residue can be a significant part of the operating cost, so it is quoted with the plant rather than discovered later.