Saudi wastewater discharge limits: coastal water, surface water and land

Saudi Arabia does not apply one treated-wastewater table to every outlet. The receiving route selects the appendix, and most conventional parameters carry both a 30-day average and a maximum for any sample. Reuse is a separate approval question and must not be read from the discharge tables.

A clear sample bottle beside a wastewater channel with process pipework behind it
Operations & compliance
On this page

A plant proposed for a coastal outfall, a surface-water discharge and land application cannot be checked against one “Saudi effluent limit”. The numbers differ by route, and some parameters that look stricter on one route are not listed at all on another. This page transcribes the main values from the official English regulation and keeps their averaging periods attached.

The instrument and the authority

The governing instrument is the Executive Regulations for the Protection of Aqueous Media from Pollution, under the Environmental Law issued by Royal Decree No. M/165, dated 19/11/1441 Hijri. The National Center for Environmental Compliance (NCEC) is the centre responsible for the controls and discharge permits. The official English text is published by MEWA; its own note says that the Arabic original prevails if the translation differs.

Article 2 applies the regulation to persons and activities affecting aqueous media in Saudi Arabia, including territorial waters and the other maritime areas it names. Article 5 prohibits discharging untreated wastewater or other liquid substances into environmental media or injecting them into ground wells. Article 6 then requires the standards in Appendices 2 and 3 before treated wastewater is discharged to soil, land or waterbodies.

The receiving route selects the table

Wide table: scroll sideways to see every column.

RouteWhere the discharge limits sitWhat must not be assumed
Coastal or marine waterAppendix 2The surface-water column is not interchangeable with it
Surface waterAppendix 3, surface-water columnLand values cannot be substituted
Soil or landAppendix 3, soil/land columnIt is not automatically a reuse approval
Reuse for irrigation or another applicationThe applicable treated-sewage-effluent and project requirementsAppendix 2 or 3 alone does not define the reuse water quality

The route is fixed before the number is read. A permit or a competent authority can add site-specific conditions.

Discharge to environmental media requires an NCEC permit. Sending wastewater to a central treatment plant, applying for a temporary exception and reusing treated water are distinct routes with their own controls; none of them is a reason to copy the nearest discharge value into a specification.

The main limits, with the receiving routes side by side

Where the regulation prints a value followed by another value in parentheses, the first is the 30-day average and the parenthesised value is the maximum for any sample. “Sample” means the single-sample column rather than a 30-day average. A dash below means the parameter is not listed for that route.

Wide table: scroll sideways to see every column.

Parameter (mg/L unless stated)Coastal or marineSurface waterSoil or land
Total suspended solids25 (40)25 (40)35 (50)
BOD510 (25)15 (20)25 (40)
COD20 (50)——
Ammoniacal nitrogen (NH3, NH4-N)1.91.95
Nitrate nitrogen (NO3-N)101015
Phosphate (PO4)12030
Fat, oil and grease, total extractable2 (sample)5 (sample)0 (sample)
Total dissolved solids—2,000 (sample)2,000 (sample)
Dissolved oxygenMinimum 2.0Minimum 2.0Normal background level
pH (pH units)6.5–96–8.46–8.4
Total coliform (MPN/100 ml)1,0001,0002,000
Total phenols0.10.0020.002

Appendices 2 and 3. Except where “sample” is stated, the conventional values carry the 30-day-average basis described above. Total phenols are an annual average of monthly samples; pH is a sample value.

There is no single “strictest” column. Coastal water has the lowest BOD average and a COD limit; surface water has the lowest oil-and-grease ceiling after land, which prints zero; soil or land allows more BOD and suspended solids but adds a total-dissolved-solids value and a different pathogen indicator.

The absence of COD from Appendix 3 does not mean zero COD, unlimited COD or permission to use the coastal value. It means that parameter is not printed in that appendix. The permit has to be read for the actual monitoring list rather than filling the gap from another route.

The averaging period changes the answer

For coastal BOD5, 10 mg/L is the 30-day average and 25 mg/L is the maximum for any sample. Reporting only “Saudi BOD 25” removes the tighter ongoing duty. The same structure applies to TSS and COD on that route, and to the conventional parameters in Appendix 3.

Many metals and total phenols use a different basis again: an annual average of monthly samples. Cadmium, iron, lead, selenium and several other rows use 30 days in the coastal table. A compliance report therefore has to name the parameter, the route and the averaging period, not just the concentration.

Microbiological standards are not interchangeable

Wide table: scroll sideways to see every column.

IndicatorCoastal or marineSurface waterSoil or land
Total coliform (MPN/100 ml)1,0001,0002,000
Enterococci (CFU/100 ml)35——
E. coli (CFU/100 ml)126——
Viable oval nematode (number/L)—11

The microbiological rows of Appendices 2 and 3. The unit changes with the indicator: MPN is not CFU, and nematodes are counted per litre.

This is another reason a reuse or discharge specification cannot be written as “coliforms below 1,000” without context. The route decides the indicator and the unit, and coastal water carries additional bacterial indicators that the other two columns do not print.

Treatment levels are duties, not a brand of process

Appendix 4 defines secondary treatment, level C, as removal of most solids and BOD; nutrient removal, level D, follows solids removal; and disinfection, level E, addresses bacteria and viruses. Its route table assigns minimum and recommended levels for discharge options rather than naming one equipment supplier or one biological process.

The engineering consequence is to specify the effluent duty first and then the process train. Near-shore coastal water, bays and estuaries carry nutrient removal in the printed minimum levels, with disinfection in the recommended levels. A package plant can be part of that train, but the equipment name does not replace the route-specific treatment and monitoring requirement.

Monitoring, emergency storage and permits

  • Wastewater treatment plants producing more than 60 m³/day.
  • Industrial wastewater treatment plants and industrial activities with treatment units.
  • Saline-water desalination plants.
  • Activities permitted to inject treated wastewater into ground wells.
  • Other permitted dischargers, under the measurement programme set by NCEC.

Monitoring programmes and analyses must use a service provider approved by NCEC. An exceedance, whether caused by an emergency, an accident or ordinary operation, must be reported immediately and the pollution source stopped while a treatment plan is prepared. Monitoring and analysis records are kept for at least five years.

Facilities treating wastewater or sending it to central treatment must have emergency containment equal to thirty-six hours of the facility’s treated volume, lined with an impermeable material such as HDPE. Water stored in an emergency still has to be treated to the applicable appendix before discharge.

NCEC states a thirty-working-day decision period for a complete permit application, with a possible ten-working-day extension. Discharging treated wastewater, operating ambient-water monitoring networks and temporarily exceeding the standards all require the relevant licence or permit; an exception is not something a plant can grant itself.

Outfalls and mixing zones do not replace treatment

The regulation requires outfall and mixing-zone design to consider sensitive habitats, fishing and breeding areas, coral reefs and neighbouring mixing zones. It expressly says a mixing zone must not substitute for wastewater treatment or emergency response. Appendix 5 caps the horizontal mixing-zone radius at 100 metres and requires case-by-case consultation where the screening model cannot achieve the required range.

Reuse is a separate standard question

The tables above are discharge standards for environmental media. They are not a complete irrigation or unrestricted-reuse specification. Where the objective is toilet flushing, landscape irrigation, agricultural use or groundwater recharge, the intended application and its treated-sewage-effluent requirements have to be established separately with the competent water and environmental authorities. The process train and the monitoring plan follow that application, not the nearest discharge number.

What we need before sizing a Saudi plant

  • The discharge or reuse route, the site location and the receiving environment.
  • The NCEC permit or its application status, plus any site-specific conditions.
  • Design flow, daily pattern and whether production exceeds 60 m³/day.
  • Influent BOD, COD, TSS, ammonia, nitrate, phosphate, oil and grease, TDS and the relevant microbiological indicator.
  • Industrial or desalination streams, which have to be characterised separately from domestic sewage.
  • Emergency storage, sludge handling and the approved monitoring provider.
  • Ambient and water-temperature range, site access and the power supply (V / Hz / phase).

Questions we answer on Saudi projects

What is the Saudi BOD limit? For coastal or marine discharge it is 10 mg/L as a 30-day average with 25 mg/L as the maximum for any sample. Surface water uses 15 with 20, and soil or land uses 25 with 40 on the same average-versus-sample structure.

Does one COD limit apply everywhere? No. Appendix 2 prints 20 mg/L as a 30-day average and 50 mg/L as the single-sample maximum for coastal or marine discharge. Appendix 3 does not list COD for surface water or soil and land, so the coastal value must not be copied into those routes.

Can we use the discharge table as our irrigation standard? Not by itself. Land discharge and irrigation reuse are not the same approval question. The intended reuse application has its own water-quality and monitoring requirements.

Who issues the discharge permit? NCEC is the centre responsible under this regulation. MEWA publishes the instrument, and water-sector bodies may be relevant to collection or reuse, but the environmental discharge route should not be described as only a water-company decision.

Can we use an older PME table instead? Older documents can explain a project’s history, but they are not a substitute for the current instrument and permit. Use the current authority text and record which appendix and edition the design was checked against.

The next engineering step is therefore not a model number. It is the route, the permit conditions, the influent analysis and the averaging periods, after which the treatment train and the monitoring plan can be specified together.