What to confirm before ordering
These units sit between other equipment and the site, so the interfaces decide the supply. Confirm the following with the quotation:
- The duty and the process position: flow, head or solids load, and the stage before and after the unit.
- The inlet and outlet connections, pipe sizes and the flanges that meet the existing line.
- The power supply at the equipment terminal, and the control and instrumentation signals.
- The foundation, plinth or civil structure that carries the unit, and the lifting and access needed to place it.
- The scope of site installation, commissioning and operator training, and who provides wash water, chemicals or drainage.
These units lift, convey or polish water inside a treatment train. They do not by themselves turn arbitrary wastewater into drinking water: a drinking-water duty is checked against the source water, the intended use and the treatment it requires, which may include processes outside this range.