A plant that discharges to the municipal sewer is not judged against the river standard. NOM-002-SEMARNAT-1996 sets a much shorter list of parameters, and what it does not set matters as much as what it does: its own table carries no BOD or solids limit. This page collects what the standard actually says.

Sectioned view of a below-ground sewage pump station with inlet, wet well and discharge pipework
Operations & compliance
On this page

The standard was published in the Diario Oficial de la Federación on 3 June 1998 under the designation NOM-002-ECOL-1996, and entered into force the day after publication. It abrogated NOM-CCA-031-ECOL/1993. The 1998 text carries the ECOL designation; the standard is now cited as NOM-002-SEMARNAT-1996.

What it covers, and what it does not

It sets the maximum permissible limits for pollutants in wastewater discharged to urban or municipal sewerage, to prevent pollution of national waters and to protect the sewer infrastructure itself. It is mandatory for the party responsible for the discharge.

Three categories are expressly outside its scope: domestic wastewater, stormwater, and industrial wastewater other than process wastewater that is carried in a separate drain. A factory that sends its process water to the municipal sewer is in scope; its domestic sewage and its separate storm drain are not.

The limits in its own table

Table 1 covers fats and oils, settleable solids, and eight metals plus cyanide. Each has three values: the monthly average, the daily average and the instantaneous value.

Wide table: scroll sideways to see every column.

Parameter (mg/L unless stated)Monthly averageDaily averageInstantaneous
Fats and oils5075100
Settleable solids (ml/L)57.510
Arsenic, total0.50.751
Cadmium, total0.50.751
Cyanide, total11.52
Copper, total101520
Hexavalent chromium0.50.751
Mercury, total0.010.0150.02
Nickel, total468
Lead, total11.52
Zinc, total6912

Table 1 of the standard. The text published in the DOF is the reference.

The instantaneous column is a reference value, not an automatic violation. If any single analysis exceeds it, the responsible party must submit the daily and monthly averages, with the laboratory results behind them, to the competent authority within the time and form set by local law.

pH, temperature and floating matter

pH must stay between 5.5 and 10 units, measured on each simple sample, and no single sample may fall outside the range. Temperature is limited to 40 °C, measured instantaneously on each simple sample; a higher temperature is allowed only where a study demonstrates to the authority that it does no harm to the system. Floating matter must be absent.

Where BOD and suspended solids come from

This is the part most often missed. The standard sets no BOD or total suspended solids value of its own. Section 4.6 refers those two parameters to Table 2 of NOM-001-ECOL-1996, or to the particular discharge conditions that apply to the municipal discharge.

A party that cannot meet that reference may instead remove BOD and solids jointly at the municipal plant. That route requires a viability study showing no harm to the sewer system, and payment of the investment, operation and maintenance costs that correspond to its flow and pollutant load.

NOM-001-ECOL-1996 has since been replaced by NOM-001-SEMARNAT-2021, which expressly excludes discharges to municipal sewerage. NOM-002 has not been reissued in step. In practice, confirm with the operating utility which BOD and solids limit it applies to your connection before sizing.

Sampling: how many samples, how far apart

Values are read from composite samples mixed in proportion to the measured flow. Table 2 sets the number of simple samples by how many hours a day the generating process runs.

Wide table: scroll sideways to see every column.

Hours per day the process operatesSimple samplesMinimum interval (h)Maximum interval (h)
Under 42 (minimum)——
4 to 8412
Over 8 up to 12423
Over 12 up to 18623
Over 18 up to 24634

Table 2 of the standard, sampling frequency.

If the discharge is intermittent rather than continuous, the responsible party submits its operating regime and sampling programme to the authority for approval.

Compliance dates were staggered by population

The standard did not apply everywhere at once. Section 4.11 set the deadline by the population of the municipality, using the 1990 census as the reference.

Wide table: scroll sideways to see every column.

Population rangeCompliance from
Over 50,000 inhabitants1 January 1999
20,001 to 50,0001 January 2004
2,501 to 20,0001 January 2009

Table 3 of the standard.

New installations, and capacity increases or extensions made after the standard came into force, are not covered by that schedule: they must comply within 180 calendar days of starting operation, and notify the authority of that date.

Particular conditions override the table

The competent authority — the state or municipal government, or its water body — may set particular discharge conditions, individually or collectively. Those conditions can set new limits and can add parameters the standard does not cover, provided a technical study supports them.

Two further rules matter for design. Where the supply water already carries a concentration of a parameter in Table 1, that concentration may be added to the limit, if it is demonstrated and notified in writing. And a plant that concentrates its pollutants by installing water-efficiency or recycling measures can apply for particular conditions rather than being held to the general table.

What this means for the treatment train

For a discharge to the sewer the design driver is usually fats and oils and settleable solids, not BOD. A grease separator and primary settling close most of the gap; the 50 mg/L monthly average for fats and oils is what decides whether a food or restaurant discharge needs a separator at all.

Metals decide whether chemical precipitation is needed. Where a process stream carries copper, zinc or chromium, the Table 1 values are tight enough that a precipitation and settlement stage is usually the minimum, with pH control designed in from the start rather than added afterwards.

What we need to size the plant

  • Which parameters apply, from the operating utility or the particular conditions, not only from the general table.
  • Design flow, and how many hours a day the process discharges.
  • Influent characterisation for the parameters in Table 1, plus BOD and total suspended solids.
  • Whether the discharge is continuous or intermittent.
  • Whether co-treatment at the municipal plant is an option, and what the utility charges for it.
  • Site data: footprint, access for delivery, and the power supply (V / Hz / phase).

Questions we answer on Mexican projects

Does the standard set a BOD limit? Not in its own table. It refers BOD and total suspended solids to Table 2 of NOM-001-ECOL-1996, or to the particular conditions of the municipal discharge.

Is a grease trap enough? It depends on the fats and oils load. The monthly average is 50 mg/L; a separator alone clears a kitchen discharge, but a food plant with a high load usually needs dissolved air flotation or an equalisation stage ahead of it.

We discharge only a few hours a day. Does the sampling table still apply? Yes, and the number of samples changes: under four hours of operation, at least two simple samples; between four and eight hours, four samples one to two hours apart.

Is the 1998 text still the one in force? NOM-002-SEMARNAT-1996 remains the standard cited for sewer discharges, and NOM-001-SEMARNAT-2021 does not replace it, because that standard excludes sewer discharges from its scope. Check the DOF for amendments and the utility for particular conditions, because those prevail over the general table.

Tell us what the site has to treat.