Rotary rake screen.

A bar screen with a moving rake: rake teeth carried on a continuous chain comb the bars on the way up, lift the screenings above the water line and discharge them clear of the channel.

Rotary rake screen with the rake-tooth chain running up an inclined stainless steel bar frame and the drive at the top

What a rotary rake screen is, and what the site still does

A rotary rake screen is a bar screen with a moving rake: the screen surface is a set of stationary bars on an inclined frame in the channel, and a continuous chain of rake teeth combs the bars on the way up, lifts the screenings above the water line and discharges them clear of the channel. The teeth travel back on the underside of the frame, so they are out of the flow on the return pass and cannot carry material back down the channel. The frame is assembled and tested at our factory before shipment; on site the channel and its civil works, the inlet and outlet pipework to our flanges, the power and earthing, the lifting and placement, and the screenings route away from the unit are site work.

Bar spacing and capacity: no measured value is published, and why

This page publishes no bar-spacing figure, no capacity figure and no market-volume figure for the rotary rake screen, because we do not hold a measured value for this unit. Bar spacing and capacity are fixed per project from the channel survey, the design peak flow and the screenings load, and our engineering confirms them on the project drawing. Coarse spacing is the pump-station duty that takes the bulk of the debris out ahead of the impellers; fine spacing is the headworks duty that protects a smaller aperture downstream. The choice between them is a project decision, not a catalogue rule (evidence SH-RR-SPACING-01, SH-RR-CAP-01).

No capacity or spacing is invented here

The page states the duty boundary. The numbers are confirmed per project from the channel and the flow; they are not taken from a search-volume figure and they are not published as a catalogue band.

Head loss, blockage and the backflow risk

Head loss through a clean rake screen is not the design case: a blinded screen or a peak rag load costs more head, and the channel has to carry the freeboard and the upstream level to keep the flow moving. The rake teeth comb the bars on the way up and return on the underside of the frame, out of the flow, so they cannot carry material back down the channel on the return pass. The head-loss allowance and the approach velocity are fixed per project with the channel hydraulics (evidence SH-RR-HEADLOSS-01).

Lifting and discharging the screenings

On the ascending pass the teeth comb the material that has collected on the bars, lift it above the water line and discharge it into a skip, a conveyor or a bagging point. Because the raking is mechanical and continuous, the screen keeps the inlet clear without anyone raking the bars by hand. The discharge arrangement and the screenings route are fixed per project; the wash water, where the site uses one, and the legal outlet are site items (evidence SH-RR-LIFT-01).

Materials, wear and the drive

The bars, the rake teeth and the frame are fabricated in stainless steel, and the grade is chosen against the water. The wear parts are the rake teeth, the chain and the drive components, and their life follows the screenings load and the duty cycle. The grade, the chain and the drive are confirmed per project from a water analysis and the duty; a grade that serves a municipal inlet can pit in a chloride-rich industrial flow (evidence SH-RR-MAT-01).

What is in our supply and what stays on site

In our supply sit the bar frame, the rake chain and teeth, the drive, the head section and the discharge arrangement for the unit. On site sit the channel and its civil works, the inlet and outlet pipework to our flanges, the power and earthing, the lifting and placement, and the screenings route away from the unit. The exact split is written into the commercial offer for the project (evidence SH-RR-SUPPLY-01).

Acceptance is written into the contract: factory acceptance tests before shipment, site acceptance tests after installation, and a performance test on the retention at the design flow, with the bar spacing, the channel dimensions, the wash-water flow and the screenings discharge agreed for the project, the sampling point, the sample handling and the test method named, the party that carries a missed result named, and a failed result rectified and retested as agreed. Acceptance records are project documents; when you compare quotations, ask for the acceptance section of the contract.

The evidence basis for this page

There is no independent performance or capacity test for this rake screen on file, and the search volume for the term was not measured, so the page publishes no capacity or demand figure. The spacing, capacity, head loss and material are project values issued on the drawing. The selection and sizing guide and the design influent quality chart take the flow and the feed into the choice (evidence SH-RR-EVIDENCE-01).

The bar screen is the first screen in a train. Screens and filtration covers the family choice, the internal feed screen covers the fine inside-feed duty, the rotary drum screen covers the drum duty, and grit removal in wastewater treatment covers the grit chamber behind the screen.

Delivery

Units are assembled and tested at our factory before shipment, then shipped with export documentation. The channel dimensions, the frame angle and the discharge arrangement are confirmed against the site before the build. Loading arrangement and the delivery schedule are confirmed with each order against the packed dimensions and the port of discharge.

Information needed for selection

  • Channel dimensions
  • Design flow
  • Required bar spacing
  • Screenings discharge method
The interior of a shipping container loaded with wrapped equipment
A container loaded with wrapped equipment at the factory before export.