On this page
Three measurements that answer different questions
- How wide is the clear opening? Bar spacing is the clear gap from the edge of one bar to the edge of the next. The orientation of a rigid object affects whether it fits through. A flexible wipe can fold through an opening or drape across several bars and catch more fibres. Spacing alone cannot tell you what percentage of incoming solids the rack will capture.
- How wide is the channel? Clear channel width is the distance between the inside faces of the walls. It helps determine which frame will fit. The side frames, seals and bars take up space, and the portion above the waterline carries no flow. The area of the submerged openings is the figure that matters for flow through the rack.
- How much water reaches this channel at peak flow? Record the time interval as well as the flow. A pump starting up can produce a short surge that an hourly average smooths out. Where parallel channels share the inlet, note which channels were open and how the gates divided the flow before assigning a share of the plant total to one rack.
When checking the civil drawings for an existing channel, compare the wall-to-wall dimension with the frame and channel dimensions for each model. A separate hydraulic check needs the flow per channel, operating depth and loss data. See the CXPGS rotary rake screen model and channel dimensions.
What happens when a wipe bridges the bars?
Water passes between parallel bars while the rake lifts caught material to the discharge point. As fibres form a mat, the remaining openings have to carry a larger share of the incoming water. At the same flow, velocity through the open gaps rises. Contraction and expansion of the flow generally dissipate more energy. With a stable downstream level, the upstream water surface tends to rise. Removing the mat will usually reduce the level difference. U.S. EPA field manual, screening section.
The level difference, Δh, is the upstream water surface elevation minus the downstream elevation, measured at the same time against the same datum. Operators can trend it through a cleaning cycle. If channel velocities differ substantially on either side, a formal calculation of total head loss must also account for the change in velocity head.
What changes when one quarter of the openings are covered?
Consider an imaginary rack with a submerged projected width of 0.60 m and depth of 0.50 m, viewed along the flow. The side frames have already been excluded. With 10 mm clear gaps and 5 mm wide bars, the clean open fraction is approximately 10 ÷ (10 + 5) = 2/3, ignoring the edges. The net open area is then approximately 0.60 × 0.50 × 2/3 = 0.20 m². Dividing the flow in this channel by the remaining open area gives an average velocity through the openings.
Assumed flow in one channel held at 0.12 m³/s
Wide table: scroll sideways to see every column.
| Rack condition | Open area remaining | Average velocity through openings |
|---|---|---|
| Just cleaned | 0.20 m² | 0.12 ÷ 0.20 = 0.60 m/s |
| 25% of net openings covered | 0.15 m² | 0.12 ÷ 0.15 = 0.80 m/s |
The channel width and the clear gap are unchanged. The velocity through the remaining openings has risen by about one third.
This illustration holds flow and submerged projected area constant to isolate the effect of blockage. In service, a rising level may submerge more of the rack, or some flow may divert to another channel. These figures alone cannot predict the rise in centimetres. To assess a particular screen, use loss curves or measurements covering the relevant flows, depths and degree of blockage.
Use one rake cycle to narrow down the cause
- The upstream level rises, the downstream level holds, and the difference falls after raking. If channel flow also stayed steady, temporary matting is a plausible cause. Watch whether screenings actually land at the discharge and record the difference after cleaning. If it rises again sooner on each cycle, check for a change in incoming fibres, leaves or sheet-like debris.
- Both levels rise together and the difference stays near its usual value. Check the downstream level, pump starts and stops, and gate positions. Backwater can lift both water surfaces. If incoming flow has also risen, compare the readings with a clean-rack observation at a similar flow.
- The rake passes, but the difference stays high. From the designated observation point, see whether the rake lifts material, whether the discharge is clear and whether debris falls back into the channel. If the trend conflicts with the visible water surfaces, verify instrument readings and the level reference. Follow the plant’s shutdown, isolation and lockout procedures before investigating a jammed mechanism. New York State wastewater operator curriculum, section 2.2.
A useful shift record fits on one line: time, measured or estimated flow per channel, upstream and downstream levels, the difference before and after raking, and whether screenings discharged. Several cycles at comparable flow establish what is usual for this rack. If the plant’s high-water alarm level is being approached, follow its high-water response procedure.