Peaking factor calculator: 1,000 m³/day at Kz 2.50 gives 2502.8 m³/day of peak flow.

Enter the average daily flow in m³/day or L/s, or estimate it from a population of up to 1,000 and the British Water 150 L/(person·day) sewage flow. The page applies the Kz factor from GB 50014-2021 Table 4.1.15 and returns the peak dry-weather flow in m³/day, m³/h and L/s, with the full table below for reading without JavaScript.

Average daily flow to Kz to peak flow, in three units

Enter the average daily flow directly, or estimate it from population and a per-capita allowance. The calculator reads Kz from GB 50014-2021 Table 4.1.15. The standard note permits interpolation; the linear rule and the 2.7 clamp below 5 L/s are our calculation rules, and 1.5 at and above 1,000 L/s is the standard table value. The peak flow is returned in m³/day, m³/h and L/s.

What do you know?
Flow unit
m³/day

The dry-weather flow on an average day, not the peak. Enter it in m³/day or L/s; the unit selector sets how the figure is read.

Result

The average daily flow is the figure you entered. Peak flow is that average multiplied by the peaking factor Kz.

Average daily flow

1000.0m³/day|11.57L/s

Peaking factor Kz

2.50

Source: GB 50014-2021 Table 4.1.15

Peak flow

Daily
2502.8 m³/day
Hourly
104.3 m³/h
Per second
28.97 L/s
Request a sizing proposal

Send the average daily flow and how it was derived, and we confirm the peak flow the plant has to pass.

Data sheet draft

These are catalogue-based figures for your enquiry. Confirm them against your site data and the factory quotation before ordering.

What you entered
  • What do you know?: I know the average daily flow
  • Average daily flow: 1000 m³/day
What we derived
  • Average daily flow: 1000.0 m³/day | 11.57 L/s
  • Peaking factor Kz: 2.50
  • Daily: 2502.8 m³/day
  • Hourly: 104.3 m³/h
  • Per second: 28.97 L/s
Still to confirm
  • Whether the sewer is combined, so stormwater adds to the peak
  • The averaging period your network must handle (hourly or instantaneous peak)
  • Any local ceiling on the peaking factor set by the receiving treatment works

Kz is a design coefficient from GB 50014-2021 Table 4.1.15, not a piece of equipment. Use it to size downstream units and pipework, and confirm the value against the standard edition your project is designed to.

Average daily flow to peak flow across the Kz table

Each row is one average daily flow in m³/day and L/s, the peaking factor Kz applied at that flow, and the peak flow in three units. The lowest rows show the clamped 2.7 end and the highest rows the interpolated middle of the table. Every cell is the output of the functions behind this page and can be checked by hand.

Wide table: scroll sideways to see every column.

Average daily flow (m³/day)Average daily flow (L/s)Peaking factor KzPeak flow (m³/day)Peak flow (m³/h)Peak flow (L/s)
25.00.292.7067.52.80.78
75.00.872.70202.58.42.34
250.02.892.70675.028.17.81
1000.011.572.502502.8104.328.97
2500.028.942.235581.9232.664.61
5000.057.872.0410202.2425.1118.08
10000.0115.741.8818842.6785.1218.09
20000.0231.481.7835580.21482.5411.81

Basis: GB 50014-2021 Table 4.1.15. The standard note says an intermediate average daily flow may use interpolation; it does not specify a method. Linear interpolation between the two bracketing rows, and the 2.7 clamp below 5 L/s, are our calculation rules, not standard text. At and above 1,000 L/s the last table row gives 1.5 as a standard table value; beyond the table nothing is extrapolated. The superseded 2006 edition and the Saudi MEWA factors are not used in any calculation here — the peaking factor chart lists them and explains why the editions must not be mixed.

What this calculator does

It turns an average daily flow into a peak dry-weather flow. You can enter the average daily flow directly, in m³/day or L/s, or estimate it from a served population of up to 1,000 and the British Water 150 L/(person·day) sewage flow taken from the sewage flow calculator. The Kz factor is read from GB 50014-2021 Table 4.1.15 and interpolated between the tabulated flows.

The result is the same flow restated in three units — m³/day, m³/h and L/s — because pipework, pumps and equipment schedules each use a different one. This page computes a flow; the peaking factor chart remains the place to look the factor up, and the selection guide carries the same formula worked once by hand.

The formula

Peak flow = average daily flow × Kz. The average daily flow is in m³/day and Kz is the dry-weather flow variation factor at that flow, read as the average daily flow in L/s against Table 4.1.15. At 1,000 m³/day the average flow is 1000 ÷ 86.4 = 11.57 L/s, Kz interpolates to 2.50, and the peak flow is 1000 × 2.50 = 2502.8 m³/day.

The same peak flow is 2502.8 ÷ 24 = 104.3 m³/h and 2502.8 ÷ 86.4 = 28.97 L/s. Between tabulated flows Kz is interpolated linearly; below 5 L/s the 2.7 value is applied as a clamp; at and above 1,000 L/s the table row gives 1.5. The standard only says that interpolation may be used: the linear rule and the low-end clamp are our calculation rules, and nothing is extrapolated beyond the table. In population mode the average daily flow is population × 150 L/(person·day) ÷ 1000, exactly as in the sewage flow calculator, with no 90% factor.

Basis and assumptions

Every value in the calculator comes from one of the sources below, and each row states which. The Kz values are national standard table values. Linear interpolation is our calculation rule, published on the peaking factor chart; the standard note only says that interpolation may be used. The 2.7 clamp below 5 L/s is this calculator's stated decision, while 1.5 at and above 1,000 L/s is a standard table value. The single allowance band is imported unchanged from the sewage flow calculator. The superseded 2006 edition and the Saudi MEWA factors are named in the last row only so they are not confused with the 2021 table — they are not used in this calculation, and the page has no switch between editions.

ParameterValueSourceEvidence level
Kz table values2.7 / 2.4 / 2.1 / 2.0 / 1.9 / 1.8 / 1.6 / 1.5 at 5 / 15 / 40 / 70 / 100 / 200 / 500 / 1,000 L/sGB 50014-2021 Table 4.1.15National standard table value
Intermediate flowsLinear interpolation between the two bracketing table rowsOur calculation rule; the standard note only says interpolation may be usedSite rule (engineering estimate)
Below the lowest tabulated flowThe 5 L/s value of 2.7 is applied as a conservative clamp below 5 L/s; not a standard rule and not an extrapolationCalculator decision, 2026-10-23Site rule (engineering estimate)
At and above 1,000 L/s1.5, the standard table row for ≥1,000 L/s; nothing extrapolated beyond itGB 50014-2021 Table 4.1.15National standard table value
Peak flowPeak flow = average daily flow × KzPlant selection and sizing guide, same worked exampleGeneral formula
Population-mode allowance150 L per person per day; systems serving up to 1,000 populationBritish Water Flows and Loads 4, via the sewage flow calculatorIndustry-authoritative guidance
Above 1,000 populationNot used: the calculator rejects the input and points to a municipal design basisBritish Water scope statementIndustry-authoritative guidance
GB 50014-2006 and Saudi MEWA factors2.3 / 2.0 / 1.8 / 1.7 / 1.6 / 1.5 / 1.4 / 1.3 (2006); 1.6 for large cities and 2.2 for villages and hamlets (MEWA) — not used in this calculationPeaking factor chart, reference onlySuperseded edition / official guide

Worked example

A flow of 1,000 m³/day gives an average of 11.57 L/s. Kz interpolates between the 5 L/s and 15 L/s rows to 2.50, and the peak flow is 1000 × 2.50 = 2502.8 m³/day, which is 104.3 m³/h and 28.97 L/s.

The same calculation from population: 1,000 people at 150 L per person per day gives 1,000 × 150 ÷ 1000 = 150.0 m³/day. That average is 1.74 L/s, below the 5 L/s row, so Kz is clamped to 2.70 and the peak flow is 150.0 × 2.70 = 405.0 m³/day, or 16.9 m³/h and 4.69 L/s.

Below the tabulated range the end value is clamped: 200 m³/day is 2.31 L/s, below the 5 L/s row, so Kz is 2.70 and the peak flow is 200 × 2.70 = 540.0 m³/day, or 22.5 m³/h and 6.25 L/s. Every figure above is the output of the calculator on those inputs.

Limits

The calculator returns a peak dry-weather flow from the factors published for that purpose; it does not complete the design.

  • Peak dry-weather flow only. Wet-weather infiltration and inflow peaks, the peak day and the peak-hour curve are different quantities and are not modelled here; the equalization tank article explains how those are sized from a flow record.
  • Industrial sites have no municipal peaking factor. A factory is sized on its shift pattern or batch measurements, not on a per-capita allowance; the industrial wastewater article sets out why.
  • Kz is for projects without a measured flow record. Where a record exists, derive the factor from the data instead.
  • No process selection and no equipment specification. The peak flow is an input to sizing; the process train and unit size are confirmed against the project's measurements and the designer's review.

Tell us what the site has to treat.