Sewage flow calculator

Enter a served population of 1–1000 people. The British Water 150 L/(person·day) flow gives the average daily flow in m³/day, m³/h and L/s.

Calculate the average daily sewage flow

Population × 150 L/person·day ÷ 1000 gives m³/day. The hourly and per-second figures are the same flow restated for pumps, pipework and equipment schedules.

The number of people the plant serves, not the number of connected dwellings. British Water covers systems serving up to 1,000 people.

Quick pick

Per-capita sewage flow (fixed)

Fixed at the British Water 150 L/(person·day) sewage flow. The calculator does not offer other allowance bands, and no 90% factor is applied because the figure is already a sewage flow.

UK — 150 L/(person·day) sewage flow · British Water, Flows and Loads 4 (up to 1,000 population)

Average daily sewage flow

Population × 150 L/person·day ÷ 1000 gives m³/day. The hourly and per-second figures are the same flow restated.

Average daily flow
150m³/day
Hourly average
6.3m³/h
Per second
1.74L/s
Request a sizing proposal

Peak flow is the daily figure multiplied by the Kz factor: use the peaking factor chart for the factor, then the selection guide for the plant that follows.

Data sheet draft

These are catalogue-based figures for your enquiry. Confirm them against your site data and the factory quotation before ordering.

What you entered
  • Served population (persons): 1000 people
  • Per-capita sewage flow (fixed): UK — 150 L/(person·day) sewage flow · British Water, Flows and Loads 4 (up to 1,000 population)
What we derived
  • Average daily flow: 150 m³/day
  • Hourly average: 6.3 m³/h
  • Per second: 1.74 L/s
Still to confirm
  • Metered hourly and daily flow records, or the water-supply bill for the site
  • Groundwater infiltration and storm connections entering the same sewer
  • Whether industrial or trade effluent is discharged into this sewer

These are design-flow estimates from the population and per-capita figure you entered. They are a planning basis, not a substitute for metered records or the flow the design institute fixes for the project.

Population to average daily flow, British Water 150 L/(person·day)

Average daily sewage flow in m³/day for each population tier from 1 to 1,000 people. The table is complete in the page source, so it can be read and cited with JavaScript turned off.

Served populationUK 150 (m³/day)
10.15
50.75
101.5
507.5
10015
50075
1000150

Formula: population × 150 L/(person·day) ÷ 1000. British Water Flows and Loads 4 gives 150 L/(person·day) as a sewage flow (the table is a table of loadings for sewage treatment systems), so no 90% water-use conversion is applied. Its stated scope is systems serving up to 1,000 population; above that the calculator rejects the input and points to a municipal design basis. The 100, 120 and 284 L bands carried by earlier versions are removed: the first two had no cited typicality source, and the US figure is an onsite single-household design basis, not a municipal lookup column.

Basis

One published allowance band, the population scope and the reference tiers, each kept at the source and evidence level of the distillation behind this page. The British Water figure is already a sewage flow, so no 90% water-use conversion is applied. WHO does not publish a per-capita design flow — its guidance covers water quality and exposure risk, and no WHO per-capita allowance is used here.

Wide table: scroll sideways to see every column.

ParameterValueSourceEvidence level
Per-capita sewage flow150 L/(person·day)British Water, Flows and Loads 4Industry-authoritative guidance
ScopeSystems serving up to 1,000 population; above that use a municipal design basisBritish Water, Flows and Loads 4, scope statementIndustry-authoritative guidance
Population tiers1, 5, 10, 50, 100, 500 and 1,000 personsReference table of this page (display only)Display convention
WHO per-capita allowanceNo such figure exists; WHO guidance covers water quality and exposure riskNo sourceNot applicable

Formula and how to use it

  • Average daily flow (m³/day) = population × 150 (L/person·day) ÷ 1000. The British Water figure is already a sewage flow, so there is no 90% factor.
  • m³/h = m³/day ÷ 24; L/s = m³/day ÷ 86.4. Both are the same flow, restated for pumps, pipe sizing and equipment schedules.
  • The result is an average day. Multiply it by the Kz factor from the peaking factor chart for the peak flow a plant has to pass.
  • British Water covers systems serving up to 1,000 people. Above that population the calculator rejects the input: use a municipal design basis, not this small-system sewage flow.
  • Industrial sites are not sized per capita — the industrial wastewater article sets out why. US onsite figures (150 gpd per bedroom, 75 gpd per person) are a single-household design basis and are not used as a municipal lookup here.
  • WHO does not give a per-capita design flow. Where a project cites WHO guidance, that is a water-quality and exposure reference, not a sizing allowance.
  • A result here is a starting figure for sizing; the final design flow, process train and unit size are confirmed against project measurements and the designer's review.

Worked example

A settlement of 1,000 people, the top of the British Water scope: 1,000 × 150 ÷ 1000 = 150 m³/day. That is 6.3 m³/h and 1.74 L/s. No 90% factor is applied, because 150 L/(person·day) is already the sewage flow entering the treatment system.