On this page
- IPAL is a treatment plant, not one discharge limit
- First choose the discharge or reuse route
- Discharge to water media: three volume brackets
- Toilet waste treated at an IPLT has its own table
- Drainage, reuse and infiltration use different limits
- What the regulation says about treatment technology
- When domestic and industrial wastewater share a plant
- What we need before sizing an IPAL
- Questions we answer about IPAL projects
The useful question is not “what is the IPAL limit?” but “which table applies to this IPAL?” A plant discharging more than 50 m³/day to a water body, a small site using a septic unit, and a scheme infiltrating treated water into a formation are judged against different values. This page keeps those routes separate and reproduces the main limits from the official regulation.
IPAL is a treatment plant, not one discharge limit
Domestic wastewater under the regulation includes toilet wastewater (air limbah kakus) and non-toilet domestic wastewater (air limbah non-kakus), treated either separately or together with non-domestic wastewater. An IPLT is different: it is a fecal-sludge treatment installation. Industrial process wastewater has its own sector standards and should not be read from the domestic table.
Permen LH No. 11/2025 was established on 4 September 2025 and takes effect on promulgation. It revoked Permen LHK P.68/2016 on domestic wastewater and the domestic and sanitary wastewater provisions it names in Permen LH No. 19/2010 for oil, gas and geothermal activities. Existing operations covered by the transition article have up to two years from entry into force to adjust their environmental approval or monitoring where the new limits are not yet met.
The values below come from the official regulation record and its annexes. The regulation covers domestic wastewater quality standards and treatment-technology standards. Where an activity connects to a government or utility collection system, or hands the wastewater to an authorised transporter or treatment service, Article 5 provides exclusions from the quality-standard obligation; that is a different route from operating an on-site IPAL discharge.
First choose the discharge or reuse route
- Discharge to water media.
- Discharge to drainage or an irrigation channel.
- Use for watering or washing.
- Use to hold back seawater intrusion.
- Infiltration at the surface formation.
- Infiltration within a formation.
Only after that route is fixed does the volume bracket matter. The receiving-water or water-quality decision issued by the competent minister, governor, regent or mayor can add another requirement, so the permit and the current authority text still govern the site.
Discharge to water media: three volume brackets
This table applies to separately treated non-toilet domestic wastewater, or a mixture of toilet and non-toilet domestic wastewater, discharged to water media. The columns are selected by the daily volume of domestic wastewater generated.
Wide table: scroll sideways to see every column.
| Parameter | x > 50 m³/day | 3 < x ≤ 50 m³/day | x ≤ 3 m³/day |
|---|---|---|---|
| pH | 6–9 | 6–9 | 6–9 |
| BOD (mg/L) | 30 | 50 | 75 |
| COD (mg/L) | 100 | 100 | — |
| Total suspended solids (mg/L) | 30 | 50 | — |
| Ammonia as NH3-N (mg/L) | 10 | 20 | — |
| Total detergent as MBAS, laundry only (mg/L) | 5 | 10 | — |
| Oil and grease (mg/L) | 5 | 10 | 10 |
| Residual chlorine (mg/L) | 1 | 1 | 1 |
| Fecal coliform (MPN/100 ml) | 1,000 | 1,000 | 1,000 |
Annex I.A.2. A dash means the official cell is blank; it does not mean zero and no value has been inferred. pH and residual chlorine are measured directly at the compliance point.
The blank cells in the smallest-volume column are part of the printed table, not missing transcription. They should not be filled with the next column’s values. The healthcare footnote adds negative Salmonella, Shigella, Vibrio cholerae and Streptococcus requirements in the two larger columns, and changes the residual-chlorine note for qualifying health facilities that do not integrate hazardous-waste treatment and follow the required operating procedures.
Two parameters carry application notes. Total detergent applies as anionic surfactant (MBAS) to activities that wash or operate laundry. And any domestic-wastewater system whose stream contains oil and grease must include an oil-and-grease separator, with the separated material handed to an authorised third party.
Toilet waste treated at an IPLT has its own table
Wide table: scroll sideways to see every column.
| Parameter | Maximum concentration |
|---|---|
| pH | 6–9 |
| BOD (mg/L) | 150 |
| COD (mg/L) | 300 |
| Total suspended solids (mg/L) | 100 |
| Ammonia as NH3-N (mg/L) | 50 |
| Fecal coliform (MPN/100 ml) | 1,000 |
Annex I.A.1, for toilet wastewater treated at an integrated fecal-sludge treatment installation (IPLT) and discharged to water media.
These are not alternative limits for an ordinary IPAL. They belong to the IPLT route. Applying the 150 mg/L BOD value to a hotel or factory domestic-wastewater plant would use the wrong table.
Drainage, reuse and infiltration use different limits
Wide table: scroll sideways to see every column.
| Parameter | Drainage or irrigation channel | Watering or washing | Infiltration or seawater-intrusion control |
|---|---|---|---|
| pH | 6–9 | 6–9 | 6–9 |
| BOD (mg/L) | 12 | 12 | 6 |
| COD (mg/L) | 80 | 80 | 40 |
| Total suspended solids (mg/L) | 30 | 30 | 20 |
| Fecal coliform (MPN/100 ml) | 200 | 200 | 200 |
| Residual chlorine where chlorination is used (mg/L) | 1 | 1 | — |
| Nitrate as N (mg/L) | — | — | 10 |
Annex I.A.3 and Annex I.B. The infiltration column covers surface or in-formation infiltration, groundwater recharge and seawater-intrusion control. A dash means the parameter is not printed for that route.
Drainage disposal and watering or washing carry the same basic conventional values in these tables; infiltration is tighter again. Qualifying healthcare facilities have additional pathogen requirements on these routes. A reuse intent therefore has to be fixed before the process train is chosen, not added after a discharge plant has been sized.
What the regulation says about treatment technology
For no more than 3 m³/day, Annex III calls for a ready-made septic-tank package or an SNI-certified treatment unit sized to the flow, or a unit built to SNI. The tank must be watertight and its effluent must not be infiltrated. The design uses a minimum three-day retention time, with desludging records and handover of sludge or wastewater to an authorised transporter or treatment service.
For more than 3 and up to 50 m³/day, the technology annex sets out process combinations and design criteria. A grease trap is included where oil and grease may be present; an anaerobic unit is used where high COD, detergent or another organic inhibitor is expected; and filtration is included where the stream may carry more than 30 mg/L of suspended solids, turbidity or odour.
The process notes are specific about two packaged technologies. A separate biological-sludge separation unit is not used for an SBR, because settling occurs in the aerobic reactor, or for an MBR, because the membrane performs that separation. That does not make either technology compulsory; it tells the designer how the train changes when one is selected.
Other technology may be added or substituted, but the applicable quality limits still have to be met and the technical-standard obligations in Articles 10 and 11 apply. Article 6 places the standard technology combinations in the two brackets up to 50 m³/day; a larger plant still has to meet its quality table, and its process has to be engineered from the load and the route rather than copied from the small-plant diagram.
When domestic and industrial wastewater share a plant
Integrated treatment does not simply inherit the domestic table. Annex II calculates the highest combined flow as the sum of the highest flows from each activity. For a parameter shared by several streams, the combined limit is flow-weighted: Cmax = Σ(Ci × Qi) / ΣQi, using each activity’s own limit and highest flow.
A parameter that belongs to only one stream is carried separately rather than averaged away. This is why the activity list, the industrial standard and the flow split are needed before a combined plant can be specified.
What we need before sizing an IPAL
- The wastewater source: toilet, non-toilet domestic, industrial process water, or a measured mixture.
- The discharge or reuse route, and the receiving-water or approval document for the site.
- Daily domestic-wastewater volume, including the peak pattern and any planned expansion.
- Influent BOD, COD, TSS, ammonia, oil and grease, and MBAS where washing or laundry is present.
- Whether the site is a healthcare facility and whether hazardous-waste treatment is integrated.
- Sludge and separated-oil handling, including the authorised receiving service.
- Footprint, access and the power supply (V / Hz / phase).
Questions we answer about IPAL projects
Is an IPAL the same as a wastewater treatment plant? Yes. IPAL is the Indonesian term for the installation, not a particular biological process. IPLT refers specifically to fecal-sludge treatment and has its own discharge table.
Is Permen LHK P.68/2016 still the domestic-wastewater standard? No. Permen LH No. 11/2025 expressly revoked it when the new regulation took effect.
What BOD limit does an IPAL have to meet? For separately treated non-toilet or mixed domestic wastewater discharged to water media, the table gives 30, 50 or 75 mg/L according to the volume bracket. Drainage disposal and watering or washing use 12 mg/L, and the infiltration routes use 6 mg/L. Toilet waste at an IPLT is a separate table at 150 mg/L.
Does a flow of 3 m³/day or less avoid treatment? No. The small-flow route has its own treatment-technology requirements, including a watertight unit, no effluent infiltration, a minimum three-day retention time and authorised sludge handling.
Can the plant use MBR? MBR is included in the technology annex’s process criteria. Its membrane replaces the separate biological-sludge separation step. The selected train still has to meet the limit table for the actual discharge or reuse route.
Is the national table the only requirement? No. The environmental approval, the receiving-water decision and any load allocation or technical standard for the site have to be checked. The national table is the starting point, not a permit.